Installation
Back pressure regulator PaintCare BPR-L®
The back pressure regulator PaintCare BPR-L® is designed for
installation in a paint distribution room.
7.1
Assembly and initial start-up
The equipment must be assembled, connected, put into operation
and dismantled again after the termination of the service life through
by trained and qualified personnel.
The equipment must be properly integrated into the potential
equalisation before the initial start-up
Before the initial start-up, the operating company must implement the
relevant requirements from, e.g., the Industrial Safety Regulations, the
Regulations on Hazardous Chemicals and the Directive 1999/92/EU.
The back pressure regulator PaintCare BPR-L® must be installed
vibration and torque-free.
Danger
Danger to personnel and to the equipment!
The following compulsory measures must be observed when
integrating the equipment into the circulating system :
Installation of stop valves at medium inlet and outlet for the
secure locking in case of a diaphragm rupture or of repair
works.
Drain valve for the residue-free drainage of the material
back pressure valves.
Safe installation location, so that no danger to people will
occur in case of a penetration of medium.
Follow all instructions and information given in this Operating
Manual.
Only use the equipment in potentially explosive
atmospheres, for which it is intended.
The manufacturer of the complete system or the operating
company must ensure the safety of interfaces to the
machinery of the operating company and the protection
from hazards arising from the installation in the system.