3
Fabricator Instructions
Attaching Disposer
STOP!
If you have any questions about this installation call 1-888-SALVAJOR for installation advice.
1.
Carefully remove the top housing assembly by removing the eight bolts
making sure not to damage the center gasket.
2.
Apply lubricant to the rubber collar on the top housing and the beaded
collar on the transition of the ScrapMaster.
3.
Install the top housing assembly up onto the beaded collar and tighten the
clamp so the top housing assembly can not be pulled down over the bead.
Cut the rubber baffles out of the hycar adaptor to reduce bridging
of food waste.
4.
Measure distance from the bottom of the top housing to floor.
5.
Turn the disposer on its side and install the leg support on the bottom of
the disposer and adjust the leg extension so the disposer will stand
approximately 1/2” below the bottom of the top housing.
6.
Carefully balancing the disposer on the leg support, place it under the top
housing, aligning the ears on the shredder ring with the locking tabs of
the top housing.
7.
Slide the center gasket into place. Insert the top housing bolts through
holes in the top housing and into the disposer body housing. As you the
tighten bolts, the disposer will pull up securely to the top housing. Extend
the leg extension securely on the floor, and tighten set screws.
8.
If disposer drain orientation is incorrect loosen top clamp and rotate
disposer to correct location.
NOTE:
It is important that the leg fit tightly between the disposer and the floor.
SM - TABLE CUTOUT DETAIL
PSM - TABLE CUTOUT DETAIL
Weld the Pot/Pan ScrapMaster into the table using the above
dimensions for the table cutout. It is important to locate the
Pot/Pan ScrapMaster a minimum of 24 inches away from the
loading end of the warewasher to allow space for a dish rack.
Weld the ScrapMaster into the table using the above
dimensions for the table cutout. It is important to locate
the ScrapMaster a minimum of 24 inches away from the
loading end of the warewasher to allow space for a dish rack.