![Salus PCSol 201 Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/salus/pcsol-201/pcsol-201_installation-and-operation-manual_3644550053.webp)
53
19.5.
Scheme wizard
Scheme wizard is to select type of installation.
It is done by turning the knob to browse through
schemes. Number and type of schemes depend
on the controller version.
After selection, the controller will request to
confirm the scheme.
20.
FUSE REPLACEMENT
Cut off power supply to the controller
before fuse replacement.
A 1.25A time-delay subminiature fuse
should be used, as per IEC 60127 standard. An
example of a fuse meeting the requirements is
Schurter
MXT-250
time-delay
fuse
.
To
replace, open controller's enclosure and replace
burnt fuse with a new one (Fig. 20.1).
Fig. 20.1 Fuse replacement
Change register:
The manufacturer reserves the right to
make changes in design and software
without prior notice.
Содержание PCSol 201
Страница 1: ...INSTALLATION AND OPERATION MANUAL REVISION 1 1_EN Controller PCSol 201 FOR SOLAR COLLECTORS 07 2020 ...
Страница 2: ......
Страница 6: ......
Страница 7: ...OPERATING MANUAL PCSol 201 ...
Страница 27: ...INSTALLATION MANUAL PCSol 201 ...
Страница 54: ...54 ...
Страница 55: ......
Страница 56: ...SALUS Controls Made in Poland ...