SaltDogg 4553 Скачать руководство пользователя страница 5

5

TM

Hydraulic Installation Instructions

A.

 During assembly take precautions to keep all 

hydraulic components as clean as possible.

B.

 Allow enough hose length to prevent kinking 

and stretching of the hoses and to permit raising 
the dump body. Support long hoses with wire ties 
or clamps.

C

. Protect hoses from wear caused by sliding and/

or vibration.

D.

 For proper rotation of auger and spinner motors, 

hoses may be reversed.

Note:

 Use of a pipe joint sealant compatible with 

hydraulic oil is recommended for all screw fittings.

E.

 Use swivel type hose ends to connect hoses to 

flow valve.  Damage to valve body may occur if the 
fittings in flow valve are over tightened

F.

 To achieve a positive shutoff of the auger mo-

tor, the inlet flow must pass through the ball valve 
(pre-mounted to the spreader) & the supplied hose 
must connect the ball valve to the auger’s hydrau-
lic motor as shown in the figures on the bottom of 
page 4. (Inspection of this hose is recommended to 
ensure no damage has occurred during shipping)

Valve

1/2" Quick Disconnects

3/4" (1)

Wire Hose

3/4" (1) Wire Hose

1/2" (1) Wire Hose

1/2" (1) Wire Hose

1/2" (1) Wire Hose

Auger Motor

CW Rotation

Ball

Valve

Spinner Motor

CCW Rotation

3/4" Quick

Disconnects

3/4" (2) Wire Hose

1-1/4" Spiral

SuctionHose

3/4" (2) Wire Hose

1/2" (1) Wire Hose

Tank

Pump

3

1

4

Hose

5

T

A

P

S

Bill of Materials

 

HV715

 

Dual Flow Regulator Valve

 

HVC1

 

Dual Flow Regulator Console

 

SMR15

 

15 Gallon Reservoir

 

3008521/

 

Ball Valve Assembly (Stainless/Carbon) 

 

 

3008523

 

 

3008112/

 

Hose (Direct Drive/5:1 Gearbox) 

 

 

3008113

 

  item 

part no. 

qty. 

description

Hydraulic Pump Diagram

Operating Instructions

1.

 

Pre-start up.

A.

 Use high grade non foaming hydraulic oil to fill 

reservoir about 3/4 full.

B.

 Position valve on/off lever to off.

C.

 Move auger and spinner knobs on the valve to 

the open position.

D.

 Engage PTO and circulate hydraulic oil for sev-

eral minutes to warm up.

E.

 Move valve on/off lever to on.

F.

 Inspect hydraulic system for leaks.

G.

 Check auger and spinner to see if they are work-

ing properly.

H.

 Refill reservoir to 3/4 full.

I.

 Hydraulic system should now be ready for use.

2.

 

Initial use of spreader

A.

 Shut off spinner and auger knobs and position 

the on/off lever to on.  Engage the PTO and allow 
the hydraulic system to warm up.

B.

 Open the cover plate and secure vertically with 

locking brackets.

C.

 Open dump body tailgate as wide as possible 

from bottom without bearing against cover plate. 
Set stop chains.

D.

 Position spinner assembly to the far left (drivers 

side), tighten clamp.  Determine placement of mate-
rial at various spinner and auger speeds by spread-
ing a small amount of material (Far left position 
used to spread (3) three or (4) four lane highway 
from right lane).

E.

 Position spinner assembly to the far right (pas-

senger side), tighten clamp.  Determine placement 
of material at various spinner and auger speeds 
by spreading a small amount of material (Far right 
position used to spread (4) four lane highway from 
left lane).

F.

 Changing auger and spinner speeds on the valve 

and placing spinner at various positions from left to 
right will produce various spread patterns.

CAUTION

A. Be sure everyone is standing clear.

B. Be alert for anything that may require shutting 

down the system.

C. Before working in or around spreader equip-

ment, be sure all hydraulic controls are moved to 

off position.

Содержание 4553

Страница 1: ...any part will be allowed under this warranty NOTE This manual applies to spreaders starting with Serial No 4553 Table of Contents Warranty Information 1 Spreader Installation Instructions 1 2 Spreade...

Страница 2: ...spreader and the dump body weld or bolt a steel strip to the forward edge of the spreader to cover the gap H If you have purchased the tailgate side shields purchased separately as P N 924F0106 bolt...

Страница 3: ...hole in the bar Item 7 11 1 2 vertically below the dump body hinge pin center E Bolt the spinner lug Item 6 and hose clamp to the spinner frame using 1 5 16 18 x 3 4 hex head cap screw and 1 5 16 18...

Страница 4: ...Tailgate Spreaders Using hose number 3008112 insert one end into the bottom of the ball valve assembly Insert the other end into the LH port when looking from rear of the hydraulic motor 92430A 92430S...

Страница 5: ...escription Hydraulic Pump Diagram Operating Instructions 1 Pre start up A Use high grade non foaming hydraulic oil to fill reservoir about 3 4 full B Position valve on off lever to off C Move auger an...

Страница 6: ...reezing of material around auger in extremely cold weather I To extend the life of your spreader 1 Hose down and clean after each use 2 Repaint and or oil after each season CAUTION Position the valve...

Страница 7: ...mounting 3008430 3008447 19 2 Capscrew FCS038016125 FCS038016125SS 20 6 7 Nut serrated flange 92401211 3001255 direct drive 5 1 gearbox Bill of Materials item qty description Carbon Stainless 21 2 Ca...

Страница 8: ...ar Hanger Brace 924F0101 3011137 9 2 Detatch Mounting Plate 924F0102 3009526 10 2 Hinge Pin 924F0103 3011139 11 1 Hardware Bag 924F011 3006672 item qty description Carbon Stainless Bill of Materials 1...

Отзывы: