Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability. 

Copyright © 

2020

 Salsbury Industries.  All rights reserved.  (Rev. 08, 7/2/15)   Page 7 of 8 

Locker Options – 77000 Series 

Installation Instructions 

 

Anchoring Brackets - Three Wide Locker Without Legs 

Step 1 – Drill Anchor Hole Locations 

Begin the locker installation by placing the locker on its back.  Clamp 
the appropriate drill template (provided) onto the bottom shelf of the 

left  locker  against  the  side  wall  of  the  locker.    The  appropriate  drill 
template is the one that measures 4” shorter than the locker depth.  
Drill  two  (2)  3/16”  diameter  holes  and  two  (2)  3/8”  diameter  holes 
through the bottom shelf of the locker in the locations depicted on the 
template.  Repeat these steps against the right wall of the right locker 

if no additional lockers will be installed next to it. 

Step 2 – Attach Anchor and Drill Concrete Screw Holes 

Remove the template.  Attach an anchoring bracket that is 4” shorter 
than depth of locker underneath the bottom shelf of the left locker by 
placing two (2) #8 x 1/2” long self-drilling screws (provided) through 
the  two  (2)  drilled  3/16”  diameter  holes  in  the  bottom  shelf  and 
through the pre-drilled holes in the anchoring bracket.  Set the locker 
in place on the concrete base or floor.  Drill two (2) 3/16” diameter 

holes into the concrete base or floor through the two (2) drilled 3/8” 
diameter  holes  in  the  bottom  shelf  and  through  the  slots  in  the 
anchoring  brackets.    Drill  holes  at  least  2-3/8”  deep  from  the  top 
surface of the bottom shelf.  Repeat these steps to the right locker if 
installing an additional anchor. 

Step 3 – Fasten Locker to Concrete 

Attach  the  locker  to  the  concrete  base  or  floor  by  installing  two  (2) 
1/4”  x  2-1/4”  long  concrete  screws  (provided)  and  two  (2)  1/4”  flat 
washers (provided) through the two (2) drilled 3/8” diameter holes in 
the  bottom  shelf,  through  the  slots  in  the  anchoring  bracket,  and 
through the holes drilled into the concrete.  The two (2) #8 x 1/2” long 

self-drilling  screws  may  be  removed  after  installing  the  concrete 
screws.  Repeat these steps on the far right locker.  To complete the 
installation, bolt all lockers in a row together through their side walls 
with fasteners provided.  Installation is now complete. 

Содержание 77000 Series

Страница 1: ...items are separate options and may or may not be included with your order Name Plates The name plates are installed with two 2 4 slot less screws and nuts Sloping Hoods The sloping hoods are assemble...

Страница 2: ...illers are used where two 2 lockers come together in a right angle in a corner The flat top corner filler and the sloping hood corner filler attach in the same manner After aligning the two 2 lockers...

Страница 3: ...illers have been installed The in line flat top filler and the in line sloping hood filler attach in the same manner After installing the vertical front filler pieces place the in line top fillers on...

Страница 4: ...the side of the locker aligning its top edge with the top of the locker and with the two end flanges facing the locker Position the notched corners at the front of the locker Drill 1 4 diameter holes...

Страница 5: ...on liability Copyright 2020 Salsbury Industries All rights reserved Rev 08 7 2 15 Page 5 of 8 Locker Options 77000 Series Installation Instructions Additional Shelves Additional shelves are installed...

Страница 6: ...ns depicted on the templates Step 2 Attach Anchors and Drill Concrete Screw Holes Remove the templates Attach two anchoring brackets that are 4 shorter than depth of locker underneath the bottom shelf...

Страница 7: ...nchor and Drill Concrete Screw Holes Remove the template Attach an anchoring bracket that is 4 shorter than depth of locker underneath the bottom shelf of the left locker by placing two 2 8 x 1 2 long...

Страница 8: ...the floor Connect the end splice pieces using 10 24 x 3 8 long slot less screws and 10 nuts provided Complete the installation by attaching the channels to the floor and the end splice pieces to the w...

Отзывы: