Locker Options – 77000 Series
Installation Instructions
Anchoring Brackets - Three Wide Locker Without Legs
Step 1 – Drill Anchor Hole Locations
Begin the locker installation by placing the locker on its back. Clamp
the appropriate drill template (provided) onto the bottom shelf of the
left locker against the side wall of the locker. The appropriate drill
template is the one that measures 4” shorter than the locker depth.
Drill two (2) 3/16” diameter holes and two (2) 3/8” diameter holes
through the bottom shelf of the locker in the locations depicted on the
template. Repeat these steps against the right wall of the right locker
if no additional lockers will be installed next to it.
Step 2 – Attach Anchor and Drill Concrete Screw Holes
Remove the template. Attach an anchoring bracket that is 4” shorter
than depth of locker underneath the bottom shelf of the left locker by
placing two (2) #8 x 1/2” long self-drilling screws (provided) through
the two (2) drilled 3/16” diameter holes in the bottom shelf and
through the pre-drilled holes in the anchoring bracket. Set the locker
in place on the concrete base or floor. Drill two (2) 3/16” diameter
holes into the concrete base or floor through the two (2) drilled 3/8”
diameter holes in the bottom shelf and through the slots in the
anchoring brackets. Drill holes at least 2-3/8” deep from the top
surface of the bottom shelf. Repeat these steps to the right locker if
installing an additional anchor.
Step 3 – Fasten Locker to Concrete
Attach the locker to the concrete base or floor by installing two (2)
1/4” x 2-1/4” long concrete screws (provided) and two (2) 1/4” flat
washers (provided) through the two (2) drilled 3/8” diameter holes in
the bottom shelf, through the slots in the anchoring bracket, and
through the holes drilled into the concrete. The two (2) #8 x 1/2” long
self-drilling screws may be removed after installing the concrete
screws. Repeat these steps on the far right locker. To complete the
installation, bolt all lockers in a row together through their side walls
with fasteners provided. Installation is now complete.