24
SALICRU
Fig. 25.
Screen shot of the main screen of ViewPower
monitoring software.
5.2.14. Considerations before commissioning with the loads.
•
It is recommended to charge the batteries for 12
hours at least before using the UPS for first time.
To do it, supply the input of the equipment and turn the
input switch «On». The battery charger will be auto-
matically started up.
For battery modules.
Those models with extended back up times with one or
more battery modules, the fuse or battery switch has to
be turned «On» too.
•
Although the equipment can work without charging the bat-
teries for stated 12 h, the risk of a long power outage for
the first operating hours must be evaluated, because the
back up time of the UPS will be lower.
•
Do not start up the equipment and loads before section 6
states it.
Nevertheless, when it is started up, it will be done gradu-
ally, in order to avoid possible issues, at least in the first
UPS start up.
•
In case of connecting inductive loads with high consump-
tion, apart from the sensitive loads, like laser printers or
CRT monitors; their worst inrush current will be kept in
mind in order to avoid blocking the equipment.
Depending on the equipment, for this type of loads, which
are considered NON-CRITICAL, the equipment has a pro-
grammable terminal strip. Depending on the setting of that
terminal strip, the power supply will be broken or not in
case of power outage.
Содержание SLC TWIN PRO2
Страница 1: ...SLC TWIN PRO2 4 20 kVA UNINTERRUPTIBLE POWER SUPPLY UPS USER S MANUAL...
Страница 46: ...46 SALICRU...
Страница 47: ...47 SLC TWIN PRO2 UNINTERRUPTIBLE POWER SUPPLY UPS USER S MANUAL...