4.4.-  User's guide..

4.4.1.- UPS switching-on.

UPS ON/OFF switches are located behind the door with the

lever set in the horizontal position to denote OFF condition.

Before switching UPS ON check that the MANUAL BYPASS

switch is locked to the horizzontal position with a mechani-

cal lock ( and eventually the pad-lock).

To activate UPS proceed to operate the switches following

the order giveb below:

WARNING 

: Bypass Switch (2)must be open and battery

fuses must be inserted.

1- Close the MAINS INPUT switch 

(I3)

.

2- Press the "MENU" pushbutton choose the  "COMMAND

MODE " menu using the keys   (3) or       (4)and press

ENTER" (pushbuttons 3 and 4 together) to confirm.

3-  Choose "INVERTER ON-OFF" using the  keys   (3) or 

(4) and press "ENTER" (pushbuttons 3 and 4 together to

confirm): inverter and fans will start.

4-  Press "ESC" pushbutton to exit from "COMMAND MODE"

menu to visualize the status and alarm menu.

5- Close the external battery switch 

(I5)

.

6- Close  "INPUT BYPASS (RESERVE)" switch 

(I2)

.

7- Close "OUTPUT" switch 

(I4)

.

4.4.- Instrucciones de uso.

4.4.1.- Puesta en marcha del SAI.

El interruptor de puesta en marcha del SAI se encuentra
ubicado detrás de la puerta frontal. La palanca en posición
horizontal indica estado de apagado.
Antes de accionar el interruptor de puesta en marcha,
comprobar que el interruptor de BYPASS MANUAL está
bloqueado en la posición horizontal por una protección
mecánica (y opcionalmente por una cerradura con llave).
Para poner en marcha el SAI proceder a accionar los
interruptores en el siguiente orden :

ATENCIÓN

::::: El interruptor de bypas manual 

(I3)

 debe estar

abierto y los fusibles de las baterías insertados.

1- Cerrar el interruptor de MAINS INPUT 

(I3)

.

2- Seleccionar el menú "COMMAND MODE" con las teclas

 (3) o       (4) y presionar "ENTER" (teclas 3 y 4 a la vez)

para confirmar.

3- Seleccionar "INVERTER ON-OFF" con las teclas  (3) o

     (4) y presionar "ENTER" (teclas 3 y 4 a la vez) para

confirmar: El ondulador y los ventiladores arrancarán.

4- Presionar "ESC" para salir del menú "COMANDO" y

visualizar el menú de estado y alarmas.

5- Cerrar el interruptor externo de baterías 

(I5)

.

6- Cerrar el interruptor de la línea de bypass (reserva) 

(I2)

.

7- Cerrar el interruptor de OUTPUT 

(I4)

.

Secuencia de puesta en marcha

Switching ON sequence

Armario de baterías

Batteries cabinet

Содержание SLC ELITE MAX Series

Страница 1: ...CAL HANDBOOK IS HOUSED IN A PLACE KNOWN TO THE PERSONNEL OPERATING ON THE UPS SO THAT THEY CAN FIND AND USE IT ANY MOMENT Manual de Instalaci n y Operaci n Installation and Operation Manual SISTEMA DE...

Страница 2: ...2...

Страница 3: ...onsabilidad en aplicaciones d nde el mal funcionamiento del SAI o un inadecuado uso del mismo puedan causar un riesgo para la vida humana s lo ser del comprador El fabricante no aceptar responsabilida...

Страница 4: ...nstrucciones de uso 4 5 Comunicaciones con el PC 4 6 Mando a distancia opcional 4 7 Mantenimiento rutinario 4 8 Mantenimiento peri dico 4 9 Estado del SAI funcionamiento normal 4 10 Resoluci n de prob...

Страница 5: ...to Deshacerse del embalaje Deshacerse de partes met licas Deshacerse de tarjetas electr nicas Deshacerse de las bater as Deshacerse de otras partes A 5 Preguntas m s frecuentes FAQ PR LOGO FOREWORD A...

Страница 6: ...r asehayaingerido novomitar Dejarquelav ctima beba la m xima cantidad de agua o leche posible EN TODOS LOS CASOS BUSCAR INMEDIATAMENTE AYUDAM DICA A 1 FIRST AIDS Emergency Power Off In an emergency ca...

Страница 7: ...sus armarios auxiliares Los componentes internos no son reparables por el usuario NO quitar ninguna tapa protectora del armario del SAI A 2 SAFETY RULES Maximum load on the floor According to the wei...

Страница 8: ...fos met licos etc debesersustra doparaevitareventualescortocircuitos cuando se trabaja en las bater as Las bater as siempre tienen tensi n y si se cortocircuitan pueden fundir metalesyprovocarotrostip...

Страница 9: ...go C C C C Cursillo para el personal ElpersonalrelacionadoconelSAIdebeseradiestrado paraunparodeemergencia verA 1 Primerosauxilios Do not smoke Meanwhile hands on the UPS DO NOT SMOKE do not use flame...

Страница 10: ...ejemplo juntasdegoma materialespl sticosycableado esconveniente ponerse en contacto y llevar estos materiales a empresas especializadas en basura de material industrial A 4 DISMANTLING AND DISPOSAL Sh...

Страница 11: ...entaci n a las carga Cap 4 10 Resoluci n de problemas Personal requerido soporte t cnico A 5 F A Q How have you to install your UPS Refertotheinstructionssuppliedinthefollowingdocuments Chapt 2 Instal...

Страница 12: ...erlo Como obtener informaci n t cnico comercial sobre el SAI Consultar Cap 1 Vista general How to use the PC connected to the UPS RefertotheinstructionssuppliedwiththeUPSMANAGEMENT SOFTWARE Personnelr...

Страница 13: ...conversi n bypass 1 3 3 L gica y circuitos auxiliares 1 3 4 Bater as 1 3 5 Tarjeta de rel s 1 3 6 Bypass manual 1 3 7 Panel frontal 1 GENERAL OVERVIEW Table of contents 1 1 UPS general description 1...

Страница 14: ...mandomuestraelmododetrabajo repite las alarmas a trav s de LEDs y activa un zumbador 1 1 UPS general description Thesmalloutersizeofthecabinethidestheextraordinarypower of UPS The equipment has a mode...

Страница 15: ...n de las bater as no se encuentre cerca del SAI un armario mural con seccionador de bater as debe ser instalado cerca del mismo 1 1 4 Construction details The control panel is placed on the front door...

Страница 16: ...izada Enelmismoarmariosepuedeserubicarunfiltroparamejorar la corriente arm nica 1 2 3 Transformer cabinet An optional cabinet with a galvanic isolating transfomer is available and this is specifically...

Страница 17: ...ar enlacesadicionalesconotroPCoconunmandoadistancia Estatarjeta suministracontactoslibresdepotencial quemuestranlosestadosdel SAI ypermitecontrolarcualquiertipodedispositivo alarmasac sticas l mparas...

Страница 18: ...rodujo la conmutaci n desaparezca elbypasstransferir autom ticamentelacarga alondulador Los 400Vac de tensi n filtrados regenerados y estabilizados sesuministranatrav sdelinterruptordesalida UPSOUTPUT...

Страница 19: ...PANEL BYPASS INPUT Bater a baja Battery low MANUAL BYPASS MAINS INPUT 3 F N PE 3PH N PE 3 F N PE 3PH N PE TARJETA REL S RELAYS BOARD L nea de Bypass reserva Automatic bypass Convertidor step up step u...

Страница 20: ...o mec nico para impedir una maniobra accidental Dicha protecci n puede ser incluso bloqueadaparaprevenirsumaniobraporpersonalnoautorizado 1 3 3 Logic and Auxiliary circuits Thecontrollogicresidesonasp...

Страница 21: ...adodealarma Enelcap tulo 4 Operaci n se realiza una descripci n completa del citado panel 1 3 7 Front panel TheUPSoperationismanagedthroughitsfrontpanel Through it operation can be manually driven ont...

Страница 22: ...provisional para la recarga de bater as 2 5 1 Verificaci n y opciones de ajuste 2 5 2 Cableado 2 INSTALLATION Table of contents 2 1 Introduction 2 1 1 Limitations of liability 2 1 2 Material admittan...

Страница 23: ...etiqueta adhesiva de identificaci n ubicada en la parte interna de la puerta del SAI 2 1 Introduction To properly install UPS all information concerning its mechani cal and electrical interfacing is...

Страница 24: ...a la red y ponerlo en marcha el tiempo necesario para recargar las bater as Ver par grafo 2 5 Conexi n provisional para permitir la recarga de bater as reporting type of UPS model and power The cases...

Страница 25: ...as indicaciones de ARRIBA ABAJO place it properly on the floor observing the UP DOWN indications d UtilizarunacarretillaelevadoraparadepositarelSAI en el suelo use a forklift truck to place UPS on the...

Страница 26: ...AI considerando las operaciones de mantenimiento correctivo y la localizaci n y correcci n de fallos Intercambio de aire suficiente por el calor producido por el SAI Protecci n contra descargas atmosf...

Страница 27: ...N LOS SIGUIENTES PAR GRAFOS DEBEN LLEVARSE A CABO POR ELECTRICISTAS AUTORIZADOS O POR PERSONAL T CNICO CUALIFICADO Las caracter sticas tanto del contactor K1 como del magnetot rmico dependendelcalibre...

Страница 28: ...llowing table 2 2 1 Preparaci n de la red trif sica primaria Antes de proceder al conexionado del SAI es necesario comprobar Que los valores de tensi n y frecuencia son los mismos que los indicados en...

Страница 29: ...s terminales del seccionador I3 7 Conectar los cables del armario de bater as a los terminales positivo y negativo Use section cables as described in this page As far as the installation personnel s s...

Страница 30: ...4 Salida neutro Output neutral 15 Masa GND Ground GND Bornera del SAI UPS TAGBLOCK Barra de tierra hacia los usuarios Ground lead towards users Conectar a este terminal el cable de tierra proveniente...

Страница 31: ...AGRAPHS THAT FOLLOW MUST BE CARRIED OUT BY AUTHOR IZED ELECTRICIANS OR BY TECHNICAL PERSONNEL The wiring operations must be carried out under the follow ing conditions Primary mains voltage cut off Ba...

Страница 32: ...es peronoesposibleinstalar unpulsadorEPOadicional ParaconectardiversospulsadoresEPOalSAIes necesarioconectarlosenserieyluegoconectarelconjuntoaunodelospuertos disponibles en el conector CN3 Outputs of...

Страница 33: ...al Computer Any failures present will be fully displayed on the PC To set up this connection use the cable supplied with the Generex software The software together with the relative kit are optionally...

Страница 34: ...ceedtoassembleaconnectingcableupbutnotlongerthan 100m as shown in Figure 2 7 Fig 2 7 Esquema de conexi n del Panel Remoto Drawing showing Remote Panel wiring cable By pass ON By pass ON Bornera lado S...

Страница 35: ...d upon customer demand This card can be added to the Rel one 1 1 Proceed to wire connect as shown on the diagram of Fig 2 8 2 Strap preset as reported in the Set up chapter 1 The Relay card cannot be...

Страница 36: ...bypass reserve line switch 2 the output switch 4 by setting the l lever to the horizontal position b Openthebatteryswitch 5 bysettingthelevertothe OFF position c OpentheBYPASSswitch 3 bysettingtheleve...

Страница 37: ...ada la conexi n de los cables cargar las bater as tal y como se indica en el cap tulo de OPERACI N 2 5 2 Wiring 1 Fully unscrew the four screws from the protection panel situated on the UPS tagblock 2...

Страница 38: ...phase U2 L11 2 Entrada red fase V1 L21 Output phase V2 L21 3 Entrada red fase W1 L31 Output phase W2 L31 4 Entrada neutro Output neutral 5 Entrada bypass U3 L13 Input reserve U3 L13 6 Entrada bypass...

Страница 39: ...3 4 2 Comprobaci n de las conexiones el ctricas de los SAI 3 4 3 Comprobaci n de los datos de comunicaci n entre los SAI a trav s del anillo 3 4 4 Comprobaci n de los datos de comunicaci n entre ondul...

Страница 40: ...on Estado del panel frontal en la puesta en marcha del SAI EnelLCD 7 sevisualizar elsiguienteestado UPS en funcionamiento Ondulador trabajando Red principal OK Red de reserva OK Tensi n de bater a OK...

Страница 41: ...on the status state of the front panel and signalling LEDs WhenswitchingON theUPSwillsettotheautomaticBypass condition thusproducingagenericalarm redLEDglowingand buzzer alarm activated Press the que...

Страница 42: ...e depende de la carga conectada La condici n de PREALARMA DE BATER A se produce cuando Vbatt est a 350Vdc 2 La condici n de BATER A FUERA DE L MITES alarma m nima se produce cuando V batt est a 320Vdc...

Страница 43: ...he reachest communication and this makes you to choose SQP3 3ph as UPS model In case the customer o 4 y presionar ENTER teclas 3 y 4 a la vez para confirmar Ahora la carga est en bypass autom tico 4 S...

Страница 44: ...doparaapagarelSAIensituaciones de emergencia incendio inundaciones etc Se utiliza un pulsador externo de emergencia con contacto NC conectado a la tarjeta de rel s Para comprobar si funciona conrrecta...

Страница 45: ...emote EPO a Presstheexternal EMERGENCY pushbutton theUpsswitches off within 2 seconds and stops powering the load buzzer alarmandgeneralalarmactivation b ToresetswitchoffcompletelytheUPSandwaitfewminu...

Страница 46: ...apagado los contactos NC deben mostrar continuidad con su com n Comprobar que la relaci n indicada en la tabla es correcta midiendo con un tester la continuidad hmica entre el com n y los contactos re...

Страница 47: ...N Entradabypass reserva Inputbypass reserve U L1 V L2 W L3 N SAI n UPS n Entradared principal InputMains R L1 S L2 T L3 N R L1 S L2 T L3 N Entradabypass reserva Inputbypass reserve U L1 V L2 W L3 N B...

Страница 48: ...system as shown in fig A x One battery for every UPS of the parallel indipendet from Fig 1 2 Load Standard mains Standard mains Standard reserve Standard reserve BY PASS BT2 BATTERY CABINET I BATTERY2...

Страница 49: ...PUT UPS N UPS 1 GND UPS 2 BATTERY CHARGER RESERVE MAINS GND EMERGENCY BYPASS RESERVE MAINS RESERVE MAINS FEED MAINS fig A Fig A ENTRADASAI L NEABYPASS BYPASSUPSLINE INPUT REDDEBYPASS BYPASSMAINS BYPAS...

Страница 50: ...SERVE INPUT Fig B ENTRADASAI L NEABYPASS BYPASSUPSLINE INPUT ENTRADASAI UPSINPUT BYPASSMANUAL MANUALBYPASS REDDEBYPASS BYPASSMAINS CARGADORDE BATER A BATTERY CHARGER SAI1 UPS1 SALIDASAI UPS OUTPUT ARM...

Страница 51: ...PS of the systems connect optical fiber on control logic board CS0119 creating a communi cation loop as shown in the following picture for a better safety is advisable to cover optical fiber to avoid...

Страница 52: ...S OUTPUT L1 output UPS1 L1 output UPS2 L2 output UPS1 L2 output UPS2 L3 output UPS1 L3 output UPS2 N output UPS1 N output UPS2 2 3 Close the reserve and output circuit breakers of the UPS1 close the r...

Страница 53: ...te both the UPS by opening both the reserve and output switches Fig 1 1 2 5 Parar ambos equipos abriendo todos sus interrupto res Fig 1 1 L nea red Mains line L nea bypass Bypass line I1 I2 I3 SAI 1 U...

Страница 54: ...UPS2 and verify that the UPS2 is in SLAVE condition Fig 5 L nea red Mains line L nea bypass Bypass line I1 I2 I3 SAI 1 UPS 1 I4 Bypass manual Manual Bypass Salida Output L nea red Mains line L nea byp...

Страница 55: ...F Red Mains Bypass M Bypass Salida Output Red Mains Bypass M Bypass Salida Output OFF ON OFF OFF SAI 1 UPS 1 SAI 2 UPS 2 Fig 6 3 4 3 5 Cerrar el interruptor de bypass del SAI1 Abrir el interruptor de...

Страница 56: ...2 UPS 2 I4 Bypass manual Manual Bypass Salida Output L nea red Mains line L nea bypass Bypass line I1 I2 I3 SAI n UPS n I4 Bypass manual Manual Bypass Salida Output ON OFF OFF OFF Red Mains Bypass M...

Страница 57: ...UPS 2 Fig 9 3 4 4 8 Cerrar el interruptor de bypass del SAI1 los esta dos de Master Slave no se intercambian el SAI2 sigue siendo el Master y el SAI1 el Slave Fig 11 L nea red Mains line L nea bypass...

Страница 58: ...e siendo el Master y el SAI2 el Slave Fig 13 L nea red Mains line L nea bypass Bypass line I1 I2 I3 SAI 1 UPS 1 I4 Bypass manual Manual Bypass Salida Output L nea red Mains line L nea bypass Bypass li...

Страница 59: ...a de bypass reserva 4 7 4 Limpieza del armario panel frontal y rejilla de ventilaci n 4 8 Mantenimiento peri dico 4 9 Estado del SAI funcionamiento normal 4 10 Resoluci n de problemas 4 OPERATION Tabl...

Страница 60: ...ual del SAI Bajo demanda es posible suministrar una tarjeta adicional de rel s Vista frontal Front view ConectorDB9 El SAI se ha dise ado y fabricado para ofrecer una elevada prestaci n en seguridad p...

Страница 61: ...larma ac stica el encendido del indica dor rojo de alarma general y su impresi n en el display LCD 4 1 1 Operation The dual operating modes of UPS are From MAINS with mains present the load is kept po...

Страница 62: ...number Next decrease the number to set 1 4 2 1 Tecla MENU El tecla MENU 1 tiene como funci n principal el acceso a los diferentes submen s del SAI Modo Comando Hist rico de eventos Idioma de operaci n...

Страница 63: ...4 2 6 Men del Panel de control La tabla siguiente muestra los niveles de men s principales MENU ESTADO ALARMA Dentro de este men es posible ver el estado y las condi ciones de operaci n del SAI La tec...

Страница 64: ...ceder a los diferentes submen s presionando la tecla MENU segundo nivel Una vez en el segundo nivel la primera fila muestra opci n menu y utilizando las teclas NEXT y BACK es posible escoger el men de...

Страница 65: ...nferring the output load 20sec on automatic bypass reserve line This command it is also used to reset the Static Switch Locked condition condition that happen for high inrush current of the load on th...

Страница 66: ...este men el usuario puede ver y desplazarse en orden cronol gico a lo largo de los ltimos 500 eventos ocurridos La visualizaci n de los eventos es posible presionando la tecla ENTER en el men VISUALIZ...

Страница 67: ...ENTER command It is suggested to do this action only if necessary OPERATING LANGUAGE available in this menu are five languages To select the desidered language enter in menu OPERATING LANGUAGE choosi...

Страница 68: ...r los par metros del SAI Est altamente recomendado que el acceso a ste men sea realizado s lo por personal cualificado UPS CONFIGURATION This menu allows to modify parameters of UPS It is strongly rec...

Страница 69: ...5VAC toUPSstaticswitch 4 3 3 MANUAL BYPASS switch The switch is normally set to open position Bypass excluded The switch is protected against unintentional operations through a mechanical lock wich ca...

Страница 70: ...uesta en marcha del SAI El interruptor de puesta en marcha del SAI se encuentra ubicado detr s de la puerta frontal La palanca en posici n horizontal indica estado de apagado Antes de accionar el inte...

Страница 71: ...paraconfirmar 3 Seleccionar INVERTERON OFF conlasteclas 3 o 4 y presionar ENTER teclas 3 y 4 a la vez para confirmar 4 Abrir el interruptor de OUTPUT I4 5 Abrir el interruptor externo de bater as I5...

Страница 72: ...ores han arrancado 5 Cerrar el interruptor de OUTPUT I4 6 Abrir el interruptor de BYPASS MANUAL I3 7 Presionar la tecla 1 MENU 8 Seleccionar el men COMANDO con las teclas 3 o 4 ypresionar ENTER teclas...

Страница 73: ...or de OUTPUT I4 4 Abrir el interruptor externo de bater as I5 5 Abrir el interruptor de INPUT BYPASS I2 6 Abrir el interruptor de INPUT MAINS I1 En caso que fuera necesario desconetar el SAI de la pla...

Страница 74: ...los SAI f Abra el interruptor de entrada I1 de todos los SAI g Abra el interruptor de bypass I2 de todos los SAI from the loads with the inverter ON This manoeuvre could make a complete or partial de...

Страница 75: ...onamiento a Cierre el interruptor de bypass I2 de todos los SAI b Cierre el interruptor de salida I4 de todos los SAI c Abra el interruptor de bypass manual de todos los SAI d Cierre el interruptor de...

Страница 76: ...lizar esponjas o trapos humedecidos en agua o cualquier otro l quido tanto en el armario del SAI como en superf cies cercanas a l 4 7 Routine maintenance WARNING The tests described below could cause...

Страница 77: ...cronism sta te between inverter and bypass The battery voltage is in specified limits Load is supplied from the Inverter Load is supplied from the Bypass reserve line This can be a temporarycondition...

Страница 78: ...nected to the UPS Cerrar los fusibles de bater as o conectarlasbater as Switchonthe batery fuses or connect the battery Realizar un paro de la cargas conectadas Make shutdown to the connected loads Ll...

Страница 79: ...79...

Страница 80: ...salicru com 08460 Palautordera Tel 34 93 848 24 00 sat salicru com...

Отзывы: