Salford Farm Machinery Ltd.
Page 32
AC2000 Assembly Manual 2011
05-2011
Install lid so it opens away
from access platform
Apply 1/4" bead of
Eternacaulk sealant to rim of
lid before installing on tank
5
Cut hole in top of
tank for lid. Place
lid on tank top and
trace inside rim
and cut outside
mark. Do not cut
hole too big!
Use top holes for
110 bushel tank
Use middle holes
for 135 bushel tank
Use bottom holes for 160
AND 185 bushel tank
Ladder and X-brace can be
installed through either the
top or bottom of the tank
7
10
6
2
14
NOTE: Bolt sizes are
not all the same
12
Install vent hoses last,
after installing meterbox.
Cut 2 1/2" hose to
appropriate length, then
secure to vents on
meterbox and manifold
using 2 1/2" hose clamps.
15
110-160 Bushel
110-160 Bushel
185 Bushel
185 Bushel
11
20
21
18
17
9
8
8
9
11
13
13
22
Install cap over middle
vent pipe on meterbox
1
Plastic Tank Inner Ladder Parts
Return to Contents
Содержание AC2000
Страница 1: ...2011 AC2000 AIR CART ASSEMBLY AND PARTS MANUAL...
Страница 4: ...Salford Farm Machinery Ltd Page 4 AC2000 Assembly Manual 2011 05 2011 Notes Return to Contents...
Страница 38: ...Salford Farm Machinery Ltd Page 38 AC2000 Assembly Manual 2011 05 2011 Meterbox Assembly Return to Contents...