05-2011
Page 13
Salford Farm Machinery Ltd.
AC2000 Assembly Manual 2011
DETAIL B
2 PLACES
Use 1" GR. 8 bolts
in bottom 3 holes.
Use 3/4" GR. 5
bolts in side holes
12 3 13
14
15
16
ITEM QTY
PART NO.
DESCRIPTION
1
1
T00963
AIR CART TONGUE
2
2
B1680H
1" x 8" NC HEX BOLT GR. 8
3
16
BF16HS
1" HARD STRUCTURAL WASHER
4
2
BN16L
1-8 NC NYLOCK NUT
5
4
BU1050
5/8" x 5 x 4 1/2" U-BOLT
6
8
BN10L
5/8" NYLOCK NUT NC
7
1
T01064
AC1/2000 10,000LB JACK
8
1
PPI-42XL
CAT 4 CAST IRON HITCH
9
1
GJ35K48
35,000 LB SAFETY CHAIN - 48" LG.
10
1
GP12003H03 3/4" X 3" HEADED PIN
11
1
BSC0315
3/16" x 1 1/2" COTTER PIN
12
6
B1640HF
1"NF x 4" HEX BOLT GR. 8
13
6
BN16LHF
1" NF NYLOCK NUT GR. 8
14
16
B1235
3/4 x 3 1/2" GR.5 HEX BOLT PLATED
15
32
BF12HS
3/4" HARD STRUCTURAL WASHER
16
16
BN12L
3/4" NC NYLOCK NUT
17
1
T01042A
AIR CART OPERATOR STATION ASSEMBLY
Tow Between Tongue Assembly
Return to Contents
Содержание AC2000
Страница 1: ...2011 AC2000 AIR CART ASSEMBLY AND PARTS MANUAL...
Страница 4: ...Salford Farm Machinery Ltd Page 4 AC2000 Assembly Manual 2011 05 2011 Notes Return to Contents...
Страница 38: ...Salford Farm Machinery Ltd Page 38 AC2000 Assembly Manual 2011 05 2011 Meterbox Assembly Return to Contents...