
Salford Group Inc.
Page 46
MNP522-30-15A INTL 2015 522 - 30ft Front Half Assembly and Parts Manual INTERNATIONAL
36
37
For 1 1/4" lines
39
40
29
2 1/2" HOSE
GUIDE
37
have channels
34
welded to the frame
2
3
24
30
4
31
25
29
1
4" x 6" BEAM
MOUNTING
5-23
38
Some machines will
32
33
for mounting risers
41
38
27
29
6" x 10" BEAM
MOUNTING
26
29
28
6" x 8" BEAM
MOUNTING
beside each other on the secondary head.
35
Use plugs in secondary heads to when seeding
with every other opener. Plugs must be installed
symmetrically - don't block off lines that are
For 1" lines
06-2015
520 Air Distribution Parts
Return to Contents