EN |
17
SMARTY RV v2019.12
• : !
• After reinstalling the heat exchanger, fasten the heat exchanger section with the clamp. Connect the heat exchanger motor.
$='>? @ % #&
7. CONTROL
7.1. DEVICE CONTROL
Ventilation unit can be controlled using a remote control, web interface via MB-Gateway and building management system. More information about
the possibilities of controlling is provided in the table below.
MB-G WIFI + SALDA AIR app
Stouch
FLEX MCB
SA-Control
MB-Gateway
BMS
+
+
+
+
+
Modbus RTU
7.2. MEANING OF THE SYMBOLS USED IN THE INSTRUCTIONS AND ON THE DEVICE
outdoor air
supply air
extract air
exhaust air
kitchen hood
7.3. DESCRIPTIONS OF THE FUNCTIONS
Functions
MCB
Smarty 2R VER
Smarty 2R VER plus
E
E
Date and time settings
;
;
System modes for easy and-user friedly control (
Stand-by, Building protection,
Economy, Comfort
)
;
;
BOOST function (Fans operate at highst speed)
;
;
Comfortable air temperature function
;
;
Cold/heat recovery
;
;
Heating season (from a selected date, 3-day temperature average or manually)
;
;
Dryness protection
>
>
Weekly/holiday schedule
;
;
User and service control levels
;
;
M
;
;
CO
2
level indication and reduction function
>
>
Night cooling function
;
;
Relative humidity (RH) level indication and reduction function
>
>
? "
;
;
Supply air temperature control according to the extract air sensor
;
;
Monitoring function (all sensors and I/O) Mode switch (start/stop)
;
;
Manual components control
;
;
Содержание SMARTY R V
Страница 1: ...SMARTY R V EN MOUNTING AND INSTALLATION INSTRUCTION...
Страница 34: ...34 EN SMARTY RV v2019 12 8 2 THE PRINCIPAL CONNECTION SCHEME OF INTERNAL AND EXTERNAL COMPONENTS SP46...
Страница 53: ...53 SMARTY RV v2019 12...
Страница 54: ...54 SMARTY RV v2019 12...
Страница 55: ...55 SMARTY RV v2019 12...