19
Smarty 2X/3X P
www.salda.lt
Before every heating season the condensate tube shall be
filled with water as indicated during the first start-up! Before
every heating season the condensate tube shall be filled
with water as indicated during the first start-up!
* Drain (I - XI) of the condensate is installed when the device is set in position b* or c* (shown in the illustrations above).
Before installing lateral condensate drainage, it is necessary to remove a plate (III) in a metal part of the housing and make a hole. The cover (I)
should be removed, and a bath (II), caps should be removed from the hole. Condensate drainage must be inserted into the hole (IV -V) and lubricated
with sealant (VI) ); a washer should be placed from the other side and screwed using a nut (VII)). Screwing is performed by hand, until the tip of the
condensate discharge lowers into EPP part (VIII).
Smarty 3X P:
I
II
III
IV
V
VI
VII
VIII
Note.
If the collector is situated upstream, install a system with a condensate pump (offered as an accessory).
Содержание Smarty 3X P
Страница 36: ...36 Smarty 2X 3X P www salda lt ...