19
KF T120 EC
Document realized with version :
02
+SP25
Priedų pajungimas
232.1017
EI D. Aleksandarvičius
EI K. Vasiliauskas
0
2015.0.5.17
DRAWN BY
CHECKED BY
dariusaleksandravici
0
2016-07-18
SO
LI
DW
OR
KS
E
le
ct
ric
al
Us
-m
ax
. 1
2V
DC
/1
m
A
+
o
ut
-
GND
MTP010
max. 4A/250VAC
10A/12VDC
-K2
A1
A2
0-
10
V
GN
D
CO
M
1
4
2
1
3
2
1
2
2
1
5
2
+
10
V
L1
L3
L2
1
L2
2
1
L1
2
1
L3
2
NC
1
1
2
PE
L2
L1
PE
SP
27
-b
Q2
1
2
3
4
5
6
-K2
1
2
3
4
5
6
PE
1
PE
2
1
2
3
4
5
6
-F2
L3
1 2
3 4
5 6
-K2
+
10
V
1
5
2
1
3
2
1
4
2
GN
D
0-
10
V
L3
L1
L2
1
2
3
4
5
6
-F2
-K2
A1
A2
-K2
1
2
3
4
5
6
Q2
1
2
3
4
5
6
PE
PE
1
1
2
NC
1
L3
2
1
L2
2
L2
L3
1
2
2
CO
M
1
PE
2
PE
SP
27
-b
1
L1
2
L1
1 2
3 4
5 6
-K2
+
Vo
ut
GND
SMT-D-4P-EL
+
Vi
n(
m
ax
.1
.1
m
A)
GND
1
2
3
4
N
N
1
5
2
+
10
V
L2
L3
-K2
A1
A2
N
PE
PE
Q2
1
2
3
4
5
6
-K2
1
2
3
4
5
6
1
2
3
4
5
6
-F2
L1
CO
M
1
2
2
L3
1
L3
2
NC
1
1
2
0-
10
V
1
3
2
L1
1
L1
2
SP
27
-b
PE
1
PE
2
L2
1
L2
2
GN
D
1
4
2
1 2
3 4
5 6
-K2
-F5
1
2
-Stouch
1-
24
VD
C/
AC
2-
24
VA
C/
DC
3-
G
ND
4-
R
S4
65
-B
5-
RS
48
5-
A
6-
GN
D
7-
0-
10
VD
C
IN
8-
0-
10
VD
C
OU
T
CON1
Vi
n
GN
D
A
B
AO
1
GN
D
-S-1141
-G2
L
N
PE
V+ V- PE
-F6
1
2
Pressure sensor connection on the ducting. 2 possible variants.
a) The hose with “-“ must be connected before the fan. The hose with “+” measures atmospheric pressure.
+ -
SPS
+
-
IP44/54
1.5 A
CEE7/7
ModBus
CEE7/7
+ -
SPS
CEE7/7
ModBus
+ -
SPS
+
-
Exhaust air
Kitchen hood