Light Commercial R410A on-off
S13-01.01.13en
2.
Vacuum Dry and Leakage Checking
2.1 Vacuum Dry: use vacuum pump to change the moisture (liquid) into steam (gas) in the pipe and
discharge it out of the pipe to make the pipe dry. Under one atmospheric pressure, the boiling point of
water(steam temperature) is 100
Ԩ
. Use vacuum pump to make the pressure in the pipe near vacuum
state, the boiling point of water falls relatively. When it falls under outdoor temperature, the moisture in
the pipe will be vaporized.
2.2 Vacuum dry procedure
There are two methods of vacuum dry due to different construction environment: common vacuum dry,
special vacuum dry.
①
. Common vacuum dry procedure
Vacuum dry (for the first time)---connect the all-purpose detector to the inlet of liquid pipe and gas pipe,
and run the vacuum pump more than two hours (the vacuum pump should be below -755mmHg)
If the pump
can’t achieve below -755mmHg after pumping 2 hours, moisture or leakage point will still
exist in the pipe. At this time, it should be pumped 1 hour more.
If the pump
can’t achieve -755mmHg after pumping 3 hours, please check if there are some leakage
points.
Vacuum placement test: place 1 hour when it achieves -755mmHg, pass if the vacuum watch shows no
rising. If it rises, it shows there
’s moisture or leakage point.
Vacuuming from liquid pipe and gas pipe at the same time.
Sketch map of common vacuum dry procedure.
Installation
108
Содержание SOB-50VA
Страница 1: ...S13 01 01 13en Light Commercial Air Conditioner R410A ON OFF Service Manual 2013...
Страница 6: ...Light Commercial R410A on off S13 01 01 13en 2 2 Outdoor Units General Information 5...
Страница 14: ...Light Commercial R410A on off S13 01 01 13en 4 Service Space Indoor Units Four way Cassette Type Compact 13...
Страница 48: ...Light Commercial R410A on off S13 01 01 13en 4 Service Space Indoor Units Ceiling Floor 47...
Страница 55: ...Light Commercial R410A on off S13 01 01 13en SIB 100TAY SIB 140TAY SIB 200TAY Indoor Units Ceiling Floor 54...
Страница 62: ...Light Commercial R410A on off S13 01 01 13en SIB 50TAV SIB 60TAV Indoor Units Ceiling Floor 61...
Страница 63: ...Light Commercial R410A on off S13 01 01 13en SIB 100TAY SIB 140TAY SIB 200TAY Indoor Units Ceiling Floor 62...
Страница 68: ...Light Commercial R410A on off S13 01 01 13en 3 Dimensions Indoor Units HSP Duct Type 67...
Страница 69: ...Light Commercial R410A on off S13 01 01 13en Indoor Units HSP Duct Type 68...
Страница 72: ...Light Commercial R410A on off S13 01 01 13en 5 3 SIB 140DAY SIB 200DAY Indoor Units HSP Duct Type 71...
Страница 81: ...Light Commercial R410A on off S13 01 01 13en 11 Field Wiring SIB 60DAV Indoor Units HSP Duct Type 80...
Страница 82: ...Light Commercial R410A on off S13 01 01 13en SIB 100DAY SIB 140DAY SIB 200DAY Indoor Units HSP Duct Type 81...
Страница 91: ...Light Commercial R410A on off S13 01 01 13en 5 Wiring Diagrams SOB 50VA Outdoor Units 90...
Страница 92: ...Light Commercial R410A on off S13 01 01 13en SOB 60VA SOB 100YA Outdoor Units 91...
Страница 93: ...Light Commercial R410A on off S13 01 01 13en SOB 140YA SOB 200YA Outdoor Units 92...
Страница 117: ...Light Commercial R410A on off S13 01 01 13en 6 Wiring Please refer to the Wiring Diagram Installation 117...