![SAJ Suntrio-TL8K Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/saj/suntrio-tl8k/suntrio-tl8k_user-manual_3745557026.webp)
#$
23
3)Insert stripped cable into contact barrel and insure all conductor strands are captured in the
contact barrel and the conductors are visible in the contact barrel observation hole.
K &
Conductor should be visible
K &
Conductor should be visible
/! &&B!@B
Crimped socket contact
Cable Requirements
Cable Size
Cable pull – out force requirement
/!!
$/\\`!\N&
M!!
$/7\`!)\\N&
)\!!
$7\\`!))\N&
7* &!& & !! "% &
heard or felt when the contact cable assembly is seated correctly.
Содержание Suntrio-TL8K
Страница 1: ......
Страница 7: ......
Страница 14: ...11 4 3 Mounting Procedure 7 X X Y F 7 F B B B F M U...
Страница 40: ...37 F M Language Time and the setting can be changed by pressing X 0Z F M N...
Страница 42: ...39 F M 0 LCD Setting N Q Y N Q N Q X F M X X 0Z F M N Q...
Страница 54: ......