![SAJ Suntrio-TL8K Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/saj/suntrio-tl8k/suntrio-tl8k_user-manual_3745557021.webp)
#$
18
5.5 Connecting the Electricity Grid (AC)
5.5.1Conditions for the AC Connection
! ! ]!
.
Residual Current monitoring
] !
The inverter can automatically differentiate between residual currents and normal leading leakage
currents.
*BUQ U$#&]X !
)\\!*+\\!
BU$#& &&W`
connected to the inverter directly.
Connection of a Second Protective Conductor
In some installation countries, a second protective conductor is required in order to prevent a
contact current in the event of failure of the original protective conductor.(See section 5.5.3)
IEC standard 62109 requirements:
* !
10mm
2
(copper), or 16mm
2
(aluminum).
#@)7?)-)Y-\)\]!Y
& ! & ] &
!!! M!! ]
conductor at AC terminal.
5.5.2 AC Connection procedure
1)Strip the cable with the length 12mm, be careful NOT to nick conductors.
Содержание Suntrio-TL8K
Страница 1: ......
Страница 7: ......
Страница 14: ...11 4 3 Mounting Procedure 7 X X Y F 7 F B B B F M U...
Страница 40: ...37 F M Language Time and the setting can be changed by pressing X 0Z F M N...
Страница 42: ...39 F M 0 LCD Setting N Q Y N Q N Q X F M X X 0Z F M N Q...
Страница 54: ......