R5
Series
- 45 -
Figure 6.9 Curve for a Volt-Var control mode (AS4777 Series)
Setting procedure
:
1
.
AS4777 grid compliance has been set during production, please select
corresponding grid compliance according to state regulation during installation. You
can choose a state regulation compliance with your local grid via eSolar WiFi-D
module or eSolar O&M APP.
2. Log in to eSolar O&M APP, click “Local Connection”, for connection procedure
please refer to chapter 6.2.2 Nearby monitoring.
3. Click “V-Watt/V-Var” to enter DNSPs settings, choose a suitable state regulation
from the drop down list. Click “DETAILS” for detailed parameter.
Figure 6.10 APP Setting
Содержание R5 Series
Страница 1: ...R5 Series 1...
Страница 23: ...R5 Series 22 Figure 4 11 Install anti theft lock of R5 15K 17K 20K T2 AUS...
Страница 59: ...R5 Series 58...