5.15
Fill the system to 115psi, hold and monitor for 45 minutes.
Check all the refrigeration connections with a leak detector.
If during the 45 minutes of monitoring the pressure in the
ÃÞÃÌi`iViÃ]Ì} ÌiÀÀiy>ÀiÌ iViVÌ>`ÀiÃÌ>ÀÌ
the test. Repeat if necessary until pressure is maintained for the
45 minutes.
NOTE: Ensure through the process that the pressure does not
exceed 145psi in the Evaperator Panel and/or the pipe work
5.16 Vacuum
Once the pressure test has been successfully completed and
i>>}ivÌÀ}i >ÃLiiVwÀi`]Ì iÌÀ}iV>
be vented. The vacuum pump must be connected into the
service port to begin vacuuming / evacuating the system.
Vaccum the system to 0.5 torr (500 microns) for a minimum of
45 minutes.
5.17 Releasing Refrigerant
Once the System has been successfully pressure tested and
Û>VÕÕi`]iÝÌÀii>ÃiÌ iv>VÌÀÞ«ÀiV >À}i`Ó°È{LÃv
R134a / 513a refrigerant gas.
5.18
To do this use a 4mm allen key and rotate both service port
valves counter clockwise until fully open. See note below.
127(2SHQWKHOLTXLGOLQHVHUYLFHSRUWƓUVWDQGWKHQWKH
gas line service port