10
OPERATING HPK 65 AS HORIZONTAL
Before positioning the machine it is necessary to leave enough working area for the proper
bending operations such as extraction of the cylindrical profile, feeding of the semi product, bending of
big diameters.
If you have no alternative to install the machine in a broad area but a low-height area, then
there is a solution to this problem as shown in figure 2.
To set the machine horizontally follow these steps:
Wrap a belt capable of carrying at least 4 tons around the top roll’s shaft
(shown by
in fig. 1).
Lift the machine slowly by means of a forklift or a crane with hook.
After that, slowly lower the machine.
Attention: Do not wrap the belt around the top roll adjustment screw so that it may be bent
or its teeth may be damaged.
Figure 1
Figure 2
Содержание HPK 665
Страница 11: ...9 Note Always leave necessary safety distance Figure 3 Figure 4...
Страница 29: ...26...
Страница 30: ......
Страница 31: ...26 HYDRAULIC PLAN FOR HPK 65...
Страница 32: ......
Страница 34: ......
Страница 36: ......
Страница 38: ......
Страница 41: ......
Страница 43: ......