
12037 N Highway 99
Seminole, OK 74868
Phone (405) 382-0731
www.enviro-ok.com
www.safran‐
passenger
‐solutions.com
Copyright © 2020
Original Release
ATA 21‐00‐60
Page | 28
7.2. Evaporator Module Assembly Inspection Schedule:
NOTE
: This is the recommended visual inspection schedule for the Evaporator Module Assembly.
Adherence to this schedule will ensure that all components of the assembly are in accordance with the
manufacturer’s specifications and is necessary to detect structural failure, deterioration or damage, and to
determine the need for corrective action.
7.2.1. If any component listed in this schedule requires cleaning, refer to Cleaning Procedure
(Section 6).
7.2.2. If any component listed in this schedule requires repair and/or replacement, refer to Repair
(Section 8).
Table 6 Evaporator Inspection
Component
Type Inspection
Required Times
Evaporator Coil Assembly
Inspect refrigerant plumbing for leakage
Inspect coil fins for cleanliness and damage
Inspect cold air ducting for leaking cracks or
damage
12 Months
Evaporator housing
Assembly
Shroud Assembly
Escutcheon
Water Deflector
Inspect seam between shroud assembly and
escutcheon for signs of separation and
condensate leakage.
Inspect for cleanliness and
damage/integrity. Inspect condensate
drain, making sure hole is clear
and secure.
12 Months
Blower Assembly
Blower Motor
Blower Wheel
Blower Scroll
Inspect for cleanliness and damage/integrity
Verify that blower wheel is clean and
operates vibration free.
12 Months
Expansion Valve
Inspect for cleanliness and damage/integrity 12 Months
7.3. Compressor Assembly Inspection Schedule
NOTE:
This is the recommended visual inspection schedule for the Compressor Assembly. Adherence to this
schedule will ensure that all subcomponents of the assembly are in accordance with the manufacturer’s
specifications and is necessary to detect structural failure, deterioration or damage, and to determine the need
for corrective action.
7.3.1. If any component listed in this schedule requires cleaning, the use of a lint-free rag and
isopropyl alcohol are suggested.
7.3.2. If any subcomponent listed in this schedule requires repair, the complete assembly must be