ATA 21‐00‐60
Page | 27
CHECK (INSPECTION SCHEDULE)
7. INSPECTION SCHEDULE
7.1. Condenser Module Assembly Inspection Schedule:
NOTE
: This is the recommended visual inspection schedule for the Condenser Module Assembly.
Adherence to this schedule will ensure that all components of the assembly are in accordance with the
manufacturer’s specifications and is necessary to detect structural failure, deterioration or damage, and to
determine the need for corrective action.
7.1.1. If any component listed in this schedule requires cleaning, refer to Cleaning Procedure
(Section 6).
7.1.2. If any component listed in this schedule requires repair and/or replacement, refer to Repair
(Section 8).
Table 5 Condenser System Inspection
Component
Type Inspection
Interval
Condenser
fan/outlet
shrouds
Inspect condenser shrouds for signs of cracking,
separation between shrouds and condenser coil.
12 months
Condenser coil
Inspect condenser coil for damage or dirt accumulation.
Inspect, clean and comb coil fins. Inspect
for leakage. Inspect plumbing for damage
weathering and wear
Inspect return bends for nicks, dents, cracks, or other
damage.
12 months
Electrical wiring
Inspect wiring for insulation damage, replace as required.
12 months
Receiver dryer
assembly
Inspect for leakage. Inspect plumbing for damage,
weathering, and wear.
Verify mounting hardware is secure
12 months