BEFORE OPERATION CHECK THE FOLLOWING
1.
Check the accuracy sheet and attachment
2.
Remove the protective layers of grease and rust preventive before moving
the slides.
3.
Lubricate all slide ways and lubrication points
4.
After setting the vice to the work piece size check that the lock pin is
securely through the side of the vice and the centre block. Not in front or
behind the centre block.
5.
Insure that the vice is balanced before lifting
FEATURES
1.
Mechanical/Hydraulic spindle
2.
Down thrust “Semi-sphere Segment” mechanism eliminates jaw lift and
work tilting
3.
All surfaces ground
4.
Rigid vice body manufactured from ductile iron FCD 60JIS (equal to
GGG60) with 60kgs/mm or 80888 psi tensile strength
5.
Vice bed flame hardened to HRC 45 to minimise wear and maintain
accuracy
Page 3
Instruction Manual for PHV-130 (V330)
05/12/2014
Содержание PHV-130
Страница 2: ...Page 2 Instruction Manual for PHV 130 V330 05 12 2014...
Страница 6: ...Page 6 Instruction Manual for PHV 130 V330 05 12 2014...
Страница 7: ...Page 7 Instruction Manual for PHV 130 V330 05 12 2014...
Страница 8: ...Page 8 Instruction Manual for PHV 130 V330 05 12 2014...
Страница 9: ...Page 9 Instruction Manual for PHV 130 V330 05 12 2014...