
B
B
B
BNT
NT
NT
NT85/B
85/B
85/B
85/BNT
NT
NT
NT185
185
185
185 Series
Series
Series
Series Valve
Valve
Valve
Valve Operation
Operation
Operation
Operation Manual
Manual
Manual
Manual
- 4 -
● Meter Delayed:
The first raw shows the volume remaining (9999) of one regeneration cycle
in meter and regeneration time. “A” refers to a.m., “P” refers to p.m.
The second raw shows total usage.
U S E D 99 9 9 0 2 :0 0 A
TOTAL 9 9 9 9 9 9
● Meter Override:
The first raw shows the volume remaining (9999) of one regeneration cycle
in meter and regeneration cycle in days. “02” refers to the days remaining, “07”
refers to regeneration cycle in days.
The second raw shows total usage.
U S E D 9 9 9 9 0 2 /0 7
TOTAL 9 9 9 9 99
4
4
4
4
.
S
S
S
System
ystem
ystem
ystem Initialization
Initialization
Initialization
Initialization::::
When power is first supplied, the valve may take about two minutes to initialize,
and the valve will show:
IN ITIA LIZIN G
W A IT PLEA SE
Any key will be overridden at this time. When the valve reaches the service
position, it will display:
Regeneration Mode: Calendar Clock
0 3 :3 0 PM Se p t.1 6
0 2 /0 7 0 2 :0 0
Current Time
Regeneration Days
Current Date
Regeneration Days
Remaining
R e ge n . T im e
Regeneration Mode: Meter Immediate
0 3 :3 0 PM Se p t.1 6
M I 0 2 0 0/0 9 0 0
Current Time
Volume Remaining
Current Date
Meter Immediate
R e ge n . Capacity
Regeneration Mode: Meter Delayed
0 3 :3 0 PM Se p t.1 6
M D 0 2 0 0/0 9 0 0
Current Time
Volume Remaining
Current Date
Meter Delayed
R e ge n . Capacity