1.

 

Remove the Karabiner from the FrogLine Shuttle. The supplied Karabiner is a 
SafetyLink steel trilock and needs three distinct movements to be removed from the 
shuttle (Slide gate up, twist gate, depress gate). 

2.

 

Slide the inner component of the FrogLine shuttle to the right or left of the shuttle 
body. This will put the two shuttle karabiner connecting holes adjacent to each other 
and widen the mouth of the shuttle. The shuttle is now in the open position and can 
be placed face down onto the lifeline cable. 

3.

 

To lock the shuttle onto the cable, push the inner component from its position to the 
right or left back across the shuttle body. This will re-align the karabiner connection 
holes and narrow the mouth of the shuttle.  

4.

 

Insert the SafetyLink Karabiner through both connecting holes. This locks the shuttle 
body and inner component of the shuttle together and ensures the shuttle remains in 
the closed position.  Check that the Karabiner has locked correctly. The Shuttle is now 
secured to the life line system.

 

 

5.

 

It is a requirement when connecting a lanyard between the users harness and 
FrogLine shuttle/lifeline system that a personal tear web energy absorber be used. 
This tear web energy absorber needs to be at the harness end of the lanyard to 
ensure maximum energy absorption. 

 

MAKE SURE YOU ARE SAFE AT ALL TIMES WHILST ATTACHING OR DETACHING FROM 
THE FROGLINE LIFELINE SYSTEM. 

 

A  FALL  RESCUE  PLAN  SHOULD  BE  DEVELOPED  PRIOR  TO  USING  SAFETYLINK 
EQUIPMENT.  

 

 

ENSURE YOU USE THE SAFETYLINK KARABINER SUPPLIED ONLY. 

 

 

 

 

 

 

PROGRESSING ALONG THE LIFELINE SYSTEM 

1.

 

Always progress the system manually. Do not progress in any vehicle or motioning device. 

2.

 

When progressing towards a corner, to ensure the FrogLine Shuttle continues on a smooth path avoid cutting 
the corner sharply.

 

 

3.

 

Do not place any tools or equipment onto the lifeline system. 

 

DISCONNECTING FROM THE LIFELINE SYSTEM 

1.

 

If you are attaching to an alternative fall arrest system ensure you are attached to that system before 
disconnecting from the FrogLine System. 

2.

 

Unlock Karabiner and detach it from the FrogLine Shuttle. 

3.

 

Slide the inner component of the FrogLine shuttle to the right or left of the shuttle body. This will put the two 
shuttle karabiner connecting holes adjacent to each other and widen the mouth of the shuttle. The shuttle is 
now in the open position and can be removed from the lifeline cable. 

4.

 

Slide inner component of Shuttle into original position and insert Karabiner through the two connecting holes 
to store. 

 

  

REMEMBER YOU MUST BE SAFE AT ALL TIMES.  

Where a risk of a fall exists on entering or exiting the lifeline system additional fall prevention measures must exist. 
Where additional fall prevention exists on entry and exit the user must ensure: 

1.

 

Attachment is correctly made to the lifeline system before detaching from the additional fall prevention system. 

2.

 

DO NOT detach from the lifeline system unless correct attachment is made to the additional fall prevention system.

 

 

Содержание Classic Tuff-Post Concrete Lifeline

Страница 1: ...SafetyLink s installation handbook using only products supplied by SafetyLink Pty Ltd Failure to follow all warnings and instructions may result in serious injury or death Asia Pacific The Americas 61...

Страница 2: ...OST 11 LIFELINE SYSTEM INFORMATION 12 INSTALLATION CABLE TENSIONERS TERMINATION FITTINGS 12 TIGHTENING ASSEMBLY TORQUE SETTINGS FOR SWAGELESS TERMINALS 12 APPENDIX A SWAGELESS SWAGED FITTINGS INSTALLA...

Страница 3: ...ponents use nickel anti seize or similar boundary layer lubricant Recommended waterproofing for roof tiles Sika Flex Co Polymer Sealant Recommended waterproofing for metal roof Silicone Sealant Neutra...

Страница 4: ...check the 16mm bolt securing the FrogLine Base to the Tuff Post for rigidity and tightness If the Bolt can turn in the anticlockwise direction it will require attention Visually inspect the attachment...

Страница 5: ...on by replacement for a period of 1 one year from the date of shipment This limited warranty applies provided that a defects have arisen solely from faulty materials or workmanship b the Products have...

Страница 6: ...316 SS 1 TUFF POST300 TUFF POST 300mm 316 SS 1 CON M12x160 Anchor Rod M12X160 M12 Nut M12 Spring Washer M12 Washer 316 SS 4 TUFF POST INTERMEDIATE EXT ANCHOR PRODUCT CODE STAT FROGTUFF008C 300 PRODUC...

Страница 7: ...316 SS 1 TUFF POST600 TUFF POST 600mm 316 SS 1 CON M16x160 Anchor Rod M16x160 M12 Nut M12 Spring Washer M12 Washer 316 SS 4 TUFF POST INTERMEDIATE EXT ANCHOR PRODUCT CODE STAT FROGTUFF008C 600 PRODUC...

Страница 8: ...0mm Minimum concrete grade MPA32 Minimum anchor rod embedment 115mm Recommended chemical anchor Fischer FIS V as per Fischer Product Supplement Data sheets If any doubt exists with the strength of the...

Страница 9: ...sts is embedded in the concrete and chemical adhesive gel Remove any chemical adhesive gel that has been displaced from the anchor hole during installation Allow chemical adhesive gel to cure to full...

Страница 10: ...ssment STEP 3 Mark drill bit or set drill depth to 120mm this enables easy detection of correct length STEP 4 Drill a 14mm or 18mm hole into the concrete minimum 115mm embedment into structure concret...

Страница 11: ...TINGS Note It is always recommended to install at least one intermediate in overhead lifeline system when SRL s are used FITTING THE HEIGHT SAFETY SYSTEM TO THE TUFF POST FOLLOW BELOW STEPS FOR END IN...

Страница 12: ...manual maximum distance between End Intermediate and Corner Anchors is 10 metres 4 Connect Swaged Swageless Tensioner with Tension Indicator to FrogLine End Anchor top connection point Do not attach T...

Страница 13: ...ace between the jaws 3 Place the brass pressure ring on the end of the cable Make sure that the distance from the pressure ring to the end of the cable is 5 8mm 4 Slide the jaw housing over the jaws 5...

Страница 14: ...1x19 7x19 and 7x7 cable The measurement should be taken with Vernier Callipers to ensure accuracy If your measurements are outside the acceptable tolerance range this can be a sign of either a loss of...

Страница 15: ...own below image Load anchorage point to 7 5kN refer pull test device instructions Ensure energy absorbing regions of the anchor system are not loaded during this test Check concrete and chemical adhes...

Страница 16: ...ption MAKE SURE YOU ARE SAFE AT ALL TIMES WHILST ATTACHING OR DETACHING FROM THE FROGLINE LIFELINE SYSTEM A FALL RESCUE PLAN SHOULD BE DEVELOPED PRIOR TO USING SAFETYLINK EQUIPMENT ENSURE YOU USE THE...

Страница 17: ...300 01 Injection Mortar FIS V Cartridge 300ml 1 CON CHEM FISMR Static Mixer FIS MR 2 FIS V 300T INJECTION MORTAR APPLICATION ANCHOR DIAMETER mm DRILL HOLE DIAMETER mm DRILL HOLE DEPTH mm MORTAR FIXING...

Страница 18: ...must only be installed and used by competent people with relevant current height safety qualifications SAFETYLINK HEIGHT SAFETY SYSTEMS MUST ONLY BE INSTALLED AS PER OUR INSTALLATION GUIDES TO STRUCTU...

Страница 19: ...owing complete access to your roof Detailed comprehensive documentation provided e g installation guides testing results product sheets should be provided SafetyLink can also provide you with a qualif...

Страница 20: ...FALL OR SHOWS A DEFECT Any piece of equipment including both personal and permanently installed items which has been used to arrest a fall or which shows any defect during operator or periodic inspect...

Отзывы: