SOP – INSSOP033 – 6m Portable Solar Hinge Pole 

Rev 2 – Owner:  General Manager – Domestic Products 

 
1.

 

Purpose 

 

The purpose of this Standard Operating Procedure (SOP) 
is to outline the safe handling method for the erection 
and lowering of the Saferoads 6-meter Solar Hinge Pole 
fitted with a 100W solar light. 

 
2.

 

Scope 

 

This  SOP  relates  to  all  Saferoads  6-meter  Solar  Hinge 
Poles.    This  also  applies  to  both  single  and  double 
concrete base block variants. 

 
3.

 

Safety   

 

The following safety guidelines must be adhered to: 
 
a)

 

Working  on  or  besides  a  roadway  is  inherently 
dangerous; 

b)

 

Checks must be performed  to ensure  there  are 
no overhead services prior to the erection of the 
pole; 

c)

 

Manual  lifting  is  not  permissible  (risk  of 
Musculoskeletal injury); 

d)

 

Only certified lifting equipment is to be used and 
checked prior to use; 

e)

 

Operators  are  to  stay  clear  of  plant  and 
equipment whilst performing this task; 

f)

 

Operators are to stay well clear of the lifting and 
lowering area; and 

g)

 

Operators  are  to  be  sure  they  keep  clear  from 
any pinch point area. 

 
4.

 

Personal Protective Equipment (PPE) 

 

The following is mandatory PPE. 

 

 

 

 

Boots 

Eye Protection 

Head 

Protection 

 

 

 

Hi Viz 

Gloves 

Protective 

Clothing 

 

 
5.

 

Assembling the light 

 

a)

 

Assemble  the  light  in  accordance  with  the 
manufactures  instructions.    Preassemble  lamp, 
mounting bracket and support bars according to 
the drawing below. 

 
 
 
 
 
 
 
 
 
 
 
 
 

a)

 

Ensure that the light is turned on.   When the button 
is depressed, the light is “off”.   When the button is in 
line with the housing the light is “on”. 

 

 

 

“Off” position 

“On” position 

 
Note:   Always assemble the light assembly prior 
to affixing to the pole.   It is then easier to offer 
the  assembly  up  to  the  pole  once  the  light, 
brackets and support bars are bolted together. 

 

b)

 

Place the end of the pole on the concrete block 
so that the hinged and fixed base plates align. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание INSSOP033

Страница 1: ...equipment is to be used and checked prior to use e Operators are to stay clear of plant and equipment whilst performing this task f Operators are to stay well clear of the lifting and lowering area and g Operators are to be sure they keep clear from any pinch point area 4 Personal Protective Equipment PPE The following is mandatory PPE Boots Eye Protection Head Protection Hi Viz Gloves Protective ...

Страница 2: ...are in a serviceable condition b Plant and equipment is to be fitted with a certified lifting jig hook Plant can consist of either a crane excavator backhoe or forklift c Ensure there are no overhead services d Ensure there are no operators forward of the base plate when the lift is occurring and all operators are well clear 7 meters from the base plate e No manual lifting is to take place 6 2 Ori...

Страница 3: ...lowing label affixed just above the lifting point This is the recommended primary lifting point The secondary lug will have the following label placed below the lug This point is used for tie down purposes for transport and it is recommended that this is not used as a lifting point b Attach the other end of the sling to the jib hook 6 5 Lifting the pole a Gradually take up the tension on the sling...

Страница 4: ...ring the pole Repeat all safety checks as outlined in section 6 1 7 1 Attach the sling a Attach the sling to the jib hook as outlined in section 6 4 b and b Attach the sling and D Shackle to the upright pole Bottom lug c Ensure that the sling is secure and remove the four 4 x base plate securing bolts and d Ensure all operators remain rearward of the concrete block e Once the bolts are removed an ...

Страница 5: ...round remove the sling from the pole and the jib hook 8 Dismantling Assembly a Once the pole has been fully lowered remove the 2 x R clips and pin b The light head can be removed by unfastening the bolts on the support bar and loosening the jacking bolts use two people to remove the light and c The pole light assembly and concrete block are now easily separated into three components for transport ...

Отзывы: