Only the copy on the Intranet is controlled – all other copies are uncontrolled

 

 

SOP – INSSOP033 – 6m Portable Solar Hinge Pole 

Rev 1 – Owner:  General Manager – Domestic Products 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Note:    Ensure  that  there  are  no  operators  are 
forward of the concrete block. 

 

c)

 

Once  the  pole  is  in  the  fully  upright  position, 
maintain the tension on the sling and secure the 
two base plates with the mounting bolts. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

d)

 

Once the mounting bolts are secure, remove the 
sling from the pole.  The pole is now considered 
to be in an operational state. 

 
7.

 

Lowering the pole 

 

Repeat all safety checks as outlined in section 6.1. 
 

7.1

 

Attach the sling 

 

a)

 

Attach  the  sling  to  the  jib  hook  as  outlined  in 
section 6.4(b); and  

b)

 

Attach  the  sling  and  “D”  Shackle  to  the  upright 
pole.  (Bottom lug) 
 

 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

c)

 

Ensure  that  the  sling  is  secure  and  remove  the 
four (4) x base plate securing bolts; and  

d)

 

Ensure  all  operators  remain  rearward  of  the 
concrete block. 

e)

 

Once  the  bolts  are  removed,  an  operator  will 
gradually tilt the pole forward.  The sling will take 
up the tension. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

f)

 

In  a  controlled  and  gradual  manner,  move  the 
plant forward which will gradually lower the pole. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

g)

 

As  the  pole  is  approaching  the  ground,  place  a 
block of wood on the ground to ensure that there 
is no damage caused to the light head housing. 

Содержание INSSOP033

Страница 1: ...equipment is to be used and checked prior to use e Operators are to stay clear of plant and equipment whilst performing this task f Operators are to stay well clear of the lifting and lowering area and g Operators are to be sure they keep clear from any pinch point area 4 Personal Protective Equipment PPE The following is mandatory PPE Boots Eye Protection Head Protection Hi Viz Gloves Protective ...

Страница 2: ...are in a serviceable condition b Plant and equipment is to be fitted with a certified lifting jig hook Plant can consist of either a crane excavator backhoe or forklift c Ensure there are no overhead services d Ensure there are no operators forward of the base plate when the lift is occurring and all operators are well clear 7 meters from the base plate e No manual lifting is to take place 6 2 Ori...

Страница 3: ...lowing label affixed just above the lifting point This is the recommended primary lifting point The secondary lug will have the following label placed below the lug This point is used for tie down purposes for transport and it is recommended that this is not used as a lifting point b Attach the other end of the sling to the jib hook 6 5 Lifting the pole a Gradually take up the tension on the sling...

Страница 4: ...ring the pole Repeat all safety checks as outlined in section 6 1 7 1 Attach the sling a Attach the sling to the jib hook as outlined in section 6 4 b and b Attach the sling and D Shackle to the upright pole Bottom lug c Ensure that the sling is secure and remove the four 4 x base plate securing bolts and d Ensure all operators remain rearward of the concrete block e Once the bolts are removed an ...

Страница 5: ...round remove the sling from the pole and the jib hook 8 Dismantling Assembly a Once the pole has been fully lowered remove the 2 x R clips and pin b The light head can be removed by unfastening the bolts on the support bar and loosening the jacking bolts use two people to remove the light and c The pole light assembly and concrete block are now easily separated into three components for transport ...

Отзывы: