Page 4
-
Only the copy on the Intranet is controlled – all other copies are uncontrolled
SOP – INSSOP033 – 6m Portable Solar Hinge Pole
Rev 1 – Owner: General Manager – Domestic Products
Note: Ensure that there are no operators are
forward of the concrete block.
c)
Once the pole is in the fully upright position,
maintain the tension on the sling and secure the
two base plates with the mounting bolts.
d)
Once the mounting bolts are secure, remove the
sling from the pole. The pole is now considered
to be in an operational state.
7.
Lowering the pole
Repeat all safety checks as outlined in section 6.1.
7.1
Attach the sling
a)
Attach the sling to the jib hook as outlined in
section 6.4(b); and
b)
Attach the sling and “D” Shackle to the upright
pole. (Bottom lug)
c)
Ensure that the sling is secure and remove the
four (4) x base plate securing bolts; and
d)
Ensure all operators remain rearward of the
concrete block.
e)
Once the bolts are removed, an operator will
gradually tilt the pole forward. The sling will take
up the tension.
f)
In a controlled and gradual manner, move the
plant forward which will gradually lower the pole.
g)
As the pole is approaching the ground, place a
block of wood on the ground to ensure that there
is no damage caused to the light head housing.