background image

Installation manual 

Vik Veg H2 

 

 

 

4.3 Installing the profiles 

The guardrail profiles (a-profile) and the W-shaped backside beam have one wide and one narrow end. 
The narrow end of the a-profile is marked with a small (8mm) hole. 

When connecting the profiles: 

 

A-profile: the wide end of the profile is placed outside the narrow end of the following barrier  

 

W-shaped backside beam: the narrow end of the profile is placed outside the wide end of the 

following beam 

in the direction of traffic. 

 

 

4.4 After installation 

When the guardrail is installed and adjusted, the holes around the post should be fully refilled. 

 

5.

 

Maintenance 

There are no general inspections intervals for this guardrail itself. Inspections intervals have to be 
determent based on local factors such as volume of traffic, risk of damage, climate etc. 

The guard rail should be inspected regularly and if displaced or damage, it should be adjusted and 
repaired. 

All damage profiles should be replaced with new when repaired. 

5.1 Cleaning 

Cleaning can be done with water and any type of Ph neutral detergent. 

 

Содержание VikOrsta VIK Veg H2

Страница 1: ... w shaped backside beam installed on Sigma posts Installation manual 12 11 2018 Leverandør Vik Elvagata20 6893 Vik i Sogn Ørsta Strandgata 59 6150 Ørsta Tlf 47 57 69 86 50 firmapost vikorsta no Tlf 47 70 04 70 00 firmapost vikorsta no ...

Страница 2: ...tant 3 2 Description 3 3 Level of performance 3 4 Installing 3 4 1 Soil and placement 3 4 2 Installing the posts 3 4 3 Installing the profiles 4 4 4 After installation 4 5 Maintenance 4 5 1 Cleaning 4 6 Bolts and fasteners 5 7 Marking 5 8 Drawing 6 ...

Страница 3: ... manual should be read carefully before installation is started 3 Level of performance According to EN 1317 Post distance Containment level Working width W Dynamic deflection Impact severity level Vehicle intrusion class 1m H2 1 3 m W4 1 1 m B 1 6 m VI5 4 Installing 4 1 Soil and placement The soil where the barrier is placed should be of sufficient quality to ensure the guardrails function The pos...

Страница 4: ...e end of the following beam in the direction of traffic 4 4 After installation When the guardrail is installed and adjusted the holes around the post should be fully refilled 5 Maintenance There are no general inspections intervals for this guardrail itself Inspections intervals have to be determent based on local factors such as volume of traffic risk of damage climate etc The guard rail should b...

Страница 5: ...galvanized 60641 Bolt M16x25 692316000 Flange nut M 16 1 1 60640 Connecting bolt M16x25 mm hot dip galvanized 60641 BoltM16x25 60643 Nut M16 60642 Washer M16 1 1 1 Placement of bolts nuts and washers Article 60614 60615 Article 60639 60640 Note Please check that all bolts fasteners are placed correct and all bolts washer nuts connections are normally proper fastened tighten 7 Marking If everything...

Страница 6: ...Installation manual Vik Veg H2 6 8 Drawing ...

Отзывы: