8
Laying the Gate across the opening, so that
the 2 bottom Wall Cups are in contact with the
floor, tighten the Nuts on the Bottom Spindles
(using the Spanner (I) if necessary) until there
is enough pressure for the 3 small pins on the
Wall Cups to mark the wall.
Hold the Gate vertical, and position the Magne-
tic Spirit Level (J) onto the metal on first one,
then the other side of the Gate. Ensure that
the bubble inside the Magnetic Spirit Level is
centered and the Gate is completely vertical,
before moving on to
Step 9A
.
Tighten the Tensioning Wheels of the Top
Spindles to push the Wall Cups towards the
wall. Keep turning until there is enough pres-
sure for the 3 small pins on the Wall Cups to
mark the wall. Once confident the marks will be
visible, undo the Tensioning Wheels and Nuts
of the Spindles to remove the Gate and unclip
the Wall Cups from the Spindle heads.
Option A:
Screw Installation of Wall Cups
7
A
8
A
Take the Marker Tool (J) out of the Magnetic
Spirit Level and mark the central, drilling point
between the 3 small marks made by each of
the 4 Wall Cups. Drill the holes.
9
A
UK