PRIME DESIGN, A SAFE FLEET BRAND
▪
Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118
▪
Toll Free: 1.8.PRIME.RACK
▪
Fax: 651-552-1799
▪
Email: [email protected]
▪
Website: www.primedesign.net
TM & © 2020 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6427889, 6764268, 6971563, 8991889, 9415726, 9506292, 9481313, 9776476, 9796340, 10470565, 10486608 AND OTHER PATENTS PENDING
9
Fig. H
View From Vehicle Front
Repeat Step 2.3
Repeat Step 2.3
Repeat Step 2.4
VRR3-FT21G-ST BO
X
ASSEMBL
Y INSTR
UCTIONS–L POSTS & Z POSTS
FRONT Z POST
4.1
Place the Front Z Post Clamp onto the top of the Front
Rotation Assembly, ensuring the Z Post Clamp seats
into the top groove as seen in Figure H below.
4.2
Repeat Steps 2.2–2.4 to complete the
assembly of the Front Rotation Z Post.
Close the right hand Slide Rotation then proceed to the
L and Z Post installation on the left hand Rotation.
4.3
Содержание PRIME DESIGN VRR3-FT21G-ST
Страница 1: ......
Страница 11: ...Page Intentionally Left Blank...
Страница 12: ...USAM VRR3FT21GSTBOX US01 Rev A 0817...