![Safe Fleet Prime Design VBR-TC11B Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/safe-fleet/prime-design-vbr-tc11b/prime-design-vbr-tc11b_assembly-instructions-manual_798247010.webp)
PRIME DESIGN, A SAFE FLEET BRAND
▪
Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118
▪
Phone: 651-552-8554
▪
Toll Free: 1.8.PRIME.RACK
▪
Fax: 651-552-1799
▪
Email: [email protected]
▪
Website: www.primedesign.net
TM & © 2018 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6764268, 6971563, 2364879, 8857689, 8511525, 8991889, 2271515, 2364897, 9506292, 9481313, 9481314, 9796340, 6202807, 6427889, 9415726 AND OTHER PATENTS PENDING
10
VBR-TC11B
ASSEMBL
Y INSTR
UCTIONS–RIGHT SIDE RO
TA
TION
Refer to the Quick
Start Guide for Z
Post positioning.
10.2
10.3
Torque to
90 in-lbs
Repeat steps 10.1
-
10.3 for
the front Z Post installation
10.4
Adjust the Cylinder Flow
Control Screw to allow
approximately 3 seconds
time for the ladder to glide
down when operating the
loaded Ladder Rack.
11
CYLINDER ADJUSTMENT
Torque to
80 in-lbs
9.8
Slide the L Post until parallel
to the Auto Clamp and the
gap between the two is
even from top to bottom
9.7
Repeat steps 9.1
-
9.8 for
the front L Post installation
9.9
Ensure both Z Post Mounting
Clamps are fully seated into
the top groove of the Upper
10.1
Slide the Z Post into the Mounting Clamp Assembly
Z POSTS
SEE QUICK START GUIDE FOR ADJUSTMENTS
Содержание Prime Design VBR-TC11B
Страница 1: ......
Страница 12: ...USAM VBRTC11B US01 Rev C 0718 ...