
7
G
G
G
G
9
8
19
1
Fixing The Legs
2
Tighten all screws
on corner bracket
STEP9
: A�ach the assembled
Support Legs
to Bo�om Board (B).
STEP11
: Insert Screw M6.4 x 53 (HW15) and �ghten using
Allen Key (HW5).
STEP10
: Remove plas�c cap from Legs. Insert the bolt of the Leg (G)
into hole of corner brace as shown in the figure above.
Insert Spring Washer (HW8) first into the hanger bolt of leg,
then followed by Nut (HW9), �ghten all the nuts using provided
Wrench (HW19). Ensure that all legs have been �ghtened then �ghten
all screws on the corner brace.
I
Laminate
12
STEP12
: A�er bringing the product upright, insert Shelf Pins (HW12) in
between the Centerboards on the desired level. Then place
the Adjustable Shelf (I) onto the Shelf Pin.
15
5
PREPARATION
*Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
*If any part is missing or damaged, do not a�empt to assemble the product.
*Es�mated Assembly Time: 60 minutes.
*Tools Required for Assembly (included): Allen Key
*If you are having difficulty, our friendly Customer Care team is always here to help. Please email