PREPARATION
STEP 7:
FASTEN SHELF DIVIDERS(G) ONTO THE
FRAMES OF THREE PIECES UPPER SHELVES
PICTURED ABOVE.
STEP 8:
PUSHING FIRMLY DOWN ON EACH SHELF AT ITS CORNER OVER PLASTIC CLIPS AND SCREW
LEVELING FEET TO ATTAIN PROPER LEVELING.
STEP 4:
SCREW UPPER POLES(D) INTO EACH
LOWER POLE BY SCREW CONNECTORS ASSMBLED
ON UPPER POLES.
STEP 5:
REFER TO STEP 3 TO ASSEMBLE THE
REMAINING TWO PIECES UPPER SHELVES
PICTURED ABOVE FIRSTLY. THEN ASSEMBLE
SHELF FRAME(C) ON THE TOP OF POLES.
STEP 6:
JAM SHELF LEDGES(H) ONTO THE FRAMES
OF TWO PIECES UPPER SHELVES AND MAKE
THEM FIXED WITH THE ADJACENT POLES AS
SHOWN IN THE PICTURE.
* Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
* If any part is missing or damaged, do not attempt to assemble the product.
* Estimated Assembly Time: 10 minutes.
* Tools Required for Assembly (included): No.
* If you are having difficulty, our friendly Customer Care team is always here to help. Please email
STEP 1:
SCREW LEVELING FEET(J) INTO BOTTOM
OF EACH STRAIGHT LOWER POLE(E) AND BENT
LOWER POLE(F). SNAP PLASTIC CLIPS(I) ONTO
SAME GROOVES OF LOWER POLES.
STEP 2:
HOLD BOTTOM SHELF(A) ON ITS SIDE
AND SLIDE IT FROM THE TOP OF EACH LOWER
POLE DOWN ONTO THE PLASTIC CLIPS.
STEP 3:
REFER TO STEP 1&2 TO SNAP PLASTIC
CLIPS ONTO SAME GROOVES OF LOWER POLES
TO ASSEMBLE THE FIRST UPPER SHELF(B).