EN
8
DIGIWAVE
III
2.5. STARTING UP
The main switch is located at the rear of the generator. Flip this switch to turn the machine on.
This switch must never be
flipped during welding
. At each start-up, the generator displays the software version, the power and the connected optional
device, as relevant of the power source.
WARNING
:
When starting up for the first time, the configuration is required cf § 6.1.
Содержание DIGIWAVE III 420
Страница 42: ...EN DIGIWAVE III 42 9 4 SPARE PARTS Capots ...
Страница 43: ...EN DIGIWAVE III 43 Composants internes et onduleur ...
Страница 44: ...EN DIGIWAVE III 44 ...
Страница 53: ...DIGIWAVE III 53 ELECTRICAL SCHEMES DIGIWAVE III 420 ...
Страница 54: ...DIGIWAVE III 520 ...