US English
5
20
5.3
Connection to the Electric
Network
This operation must only be
performed
by
specialised
technical personnel or by
the service provider.
The
Maintenance
Technician,
who
is
in
charge of the appliance's
installation, shall make sure
that:
• the power supply system complies with the safety
instructions in force;
• the voltage corresponds to that indicated on the appliance
data plate.
In case of doubt, do not
proceed
with
the
installation and ask qualified
and authorised personnel
to accurately check the
system.
Do not use adapters or
multi-sockets.
Make sure that the power
cord
plug
is
easily
reachable after installation.
Содержание Lavazza Omnia 120V
Страница 72: ...US English 10 72...
Страница 86: ......
Страница 87: ......
Страница 88: ...Cod 59A035100 Ed 00...