
English
24
7
7.5
Dose calibration
7
The vending machine is delivered with standard
calibration values set by the manufacturer.
7
Dose calibration can be performed by means of two
calibration levels:
7
•
remove the cover;
7777777
•
free the adjusting lever from the rack and put the
internal divider pulling peg into one of the 4 possible
positions in the basic coffee quantity area (7 gr - 8 gr
- 9 gr - 10 gr);
77777
•
move the adjusting lever into the rack and select the
slot corresponding to the dose required.
77777
7.6
Coffee Grind Adjustment
7
Turn the ring until the required results are obtained.
77
After any calibration three selections are necessary
before the new setting becomes effective.
7777
7.7
First start-up of the vending
machine
7
Supply the vending machine (following the instructions
given previously) and plug it into the power supply
(see section "Power Grid Connection").
7
At this point the message "IPERAUTOMATICA" will
appear on the display and the self-diagnosis phase is
activated to check the correct positioning of the
machine devices.
7
Any faults detected during the self-configuration cycle
are stored so that the vending machine can display
them at the end of the self diagnostic phase.
7
Carry out the grinder adjustment as indicated in the
instructions at section "Coffee Grinder Adjustment"
after refilling the water circuit.
7
7.8
Water circuit filling
7
At first VM start-up, the boiler is filled automatically.
7
7.8.1
Filling the boiler manually
7
After switching the vending machine on it is possible to
fill the boiler by activating the following procedure:
77
Procedure A
7
•
press the P2 key to enter the maintenance menu;
7
•
Enter the Maintenance/Washes menu and start the
automatic washing cycle;
77
Содержание IPERAUTOMATICA PREMIUM D.A. 3P2016
Страница 57: ...English 57 10 10 10 10 Remove the fan 10 10 10 10 10 Remove the gasket 10 10 10 10 10 10 10 10...
Страница 67: ......
Страница 68: ...cod H0463EN01 Powered by TCPDF www tcpdf org...