Operation and
Maintenance
Chapter Five Installation,Commissioning and
Maintenance
14
Installation
Batteries integrated in equipment should be compliance with the installation instructions, Battery
which is separately installed on rack and cabinets should be connected by bolts to the foundation.
Battery racks or cabinets should be properly installed according to instructions.
Connection
Before connecting, make a overall check of all the batteries and connectors to see whether there is
hardware damage or manufacturing defects,and make sure the right polarity.
The charge equipments are in cut-off state and without loads, then connect the positive and negative
terminals to chargers.
During the installation and transit of the battery, use insulted tools, gloves, aprons and safety
glasses,avoiding battery is impacted, do not twist connecting terminals and safety valve in transit.
Placing tools and conductive articles on the battery is strictly prohibited.
Dusty connecting terminal or loose connection will cause battery sparkle,so please keep the
connecting terminals clean and tighten the connectors as per required torque value,but please do
not cause torsional stress to terminals.
Commissioning
Assure battery operation in the clean environment.
Before operation, battery charge voltage must be adjusted as constant value as per ambient
temperature.Such as,at 25
℃
, charge the battery with 2.23V/cell for 16 to 24 hours, or with
2.33V/cell for 8 to 12 hours;
If the storage condition is serious, adjust charge voltage is necessary.