TAIL BELT TENSION
*Check the proper assembly of the tail boom.
*Check that the aluminum part of the tube is against the M3 stop screw.
*Loosen the tail group by loosening the 4 M3 screws.
*Install the belt onto the pulley, taking care to respect the direction of rotation (
figure 1
).
*Rotate the tail drive several times by hand.
*
Load the spring by rotating the tensioning arm
270°
clockwise (when looking down from the top of the helicopter).
*Tension the boom until the tensioning arm is aligned with the frame.
*Tighten the 4 screws.
*Check that the tail output shaft is perpendicular to the tube. (
figure 2
)
*In
figure 3,4,
5 you can see the three conditions, ok, too loose and too tight.
NOTE
. To disassemble the tail boom it is possible to remove the pulley H0016-S without loosening the tail unit.
Remove the locking screw and pull down.
Copyright@2012 - SAB Heli Division - All rights reserved
Page 31
Chapter 13, Installation Of The Boom
Содержание Goblin 630
Страница 1: ...REV 01 Copyright 2011 SAB Teli division All rights reserved Manual Goblin 700 Goblin 630 Manual ...
Страница 16: ...6 Main Rotor Copyright 2012 SAB Heli Division All rights reserved Page 14 Chapter 6 Head ...
Страница 18: ...7 Boom and Tail Copyright 2012 SAB Heli Division All rights reserved Page 16 Chapter 7 Tail ...
Страница 47: ......
Страница 48: ...REV 01 Copyright 2011 SAB Teli division All rights reserved Manual Goblin 700 WWW GOBLIN HELICOPTER COM ...