TAIL BELT TENSION
*Check the proper assembly of the tail boom.
*Check that the aluminum part of the tube is against the M3 stop screw.
*Loosen the tail group by loosening the 4 M3 screws.
*Install the belt onto the pulley, taking care to respect the direction of rotation (
figure 1
).
*Rotate the tail drive several times by hand.
*Load the spring by a rotation of
270°
the tensioning arm (
clockwise
)
*Tension the boom until the tensioning arm is aligned with the frame.
*Tighten the 4 screws.
*Check that the tail output shaft is perpendicular to the tube. (
figure 2
)
*In
figure 3,4,
5 you can see the three conditions, ok, too loose and too tight.
NOTE
. To disassemble the tail boom it is possible to remove the pulley H0101-S without loosening the tail unit. Remove the locking
screw and pull down.
CANOPY
On the Goblin, the canopy touches the frame.
To avoid triggering vibration, it is necessary to
attach an adhesive foam tape to the canopy
(
figure 6
). To lock the canopy saver, normal is
possible to use a litle bit of CA Glue
Allows for quick installation and removal of the canopy.
The canopy hole must be 12 to 12.5 mm in diameter.
You can enlarge the hole slightly to optimize the vertical position of the
canopy itself.
Always ensure the proper installation and locking before each flight. The lock
button must always come out to ensure locking.
It is recommended to attempt removal by forcing the canopy slightly to
ensure proper locking.
CANOPY QUICK REALISE
Copyright@2013 - SAB Heli Division - All rights reserved
Page 30
Chapter 13, Installation Of The Boom, Canopy
Содержание Goblin 630 COMPETITION
Страница 1: ......
Страница 16: ...6 Main Rotor Copyright 2013 SAB Heli Division All rights reserved Page 14 Chapter 6 Head...
Страница 25: ...7 Boom and Tail Copyright 2013 SAB Heli Division All rights reserved Page 23 Chapter 12 Tail...
Страница 47: ......
Страница 48: ...REV 01 Copyright 2011 SAB Teli division All rights reserved Manual Goblin 700 WWW GOBLIN HELICOPTER COM...