G
Mounting and Installation
Rev. 2017 - V13 GB
ATTENTION specific to PREMASGARD
®
SHD 400
Carefully read the operating instructions before you put pressure monitor into operation.
In case of damages arising from non- observance of these instructions, from improper handling or treatment,
or due to wrongful use, warranty claims are forfeited.
We do not assume any liability whatsoever for consequential damages resulting thereof.
Installation and dismounting of this device must be performed by qualified personnel.
The applicable country-specific harmonised safety regulations for the operation of pressure measuring instruments must be observed.
Respective device-specific requirements concerning protection type must be assured in built-in condition.
Schematic diagram
1
2
4
3
1
2
3
4
1
2
4
3
1
2
3
4
1
2
3
4
Output pressure 0-10V
UB– GND
UB+ 24V AC/DC
GND
1
2
3
4
Output pressure 4...20mA
UB– GND
UB+ 24V DC
GND
SHD 400 - U
SHD 400
SHD 400 - I
Connecting diagram
Connecting diagram