S+H Nolting NG-100 Скачать руководство пользователя страница 16

- 15 -

Since there may be regional differences in gas
composition, proper igniting must be checked on
site at the time of initial operation.
In the event of imperfect ignition, the position of
the ignition electrode must be adapted.
These inspections should be repeated at regular
intervals.

The performance of the pressure regulator to be
used must 

unconditionally

 correspond to the

WAH data (connection pressure and connection
load).

Control :

Control can be achieved using a room thermostat
that is connected to the respective thermostat
jack (Item 20) on the front panel of the switch
box.

5. INITIAL OPERATION AND
FURTHER START-UPS

5.1 Initial operation and further start-ups of
Device Type : NG-15

After opening the gas valve and setting the
desired heat output on the switching box of the
WAH, set the operating switch to 

I.

 The fan will

start.

Press the 

Start Gas

 thermoelectric ignition

security (Item 5) button. At the same time
depress the button Gas High Voltage Ignition
(piezo-igniter, Item 13) on the front panel of the
switch box several times, until the burner cuts in.
After ignition, press the 

Start Gas

 button for 10

seconds. If after releasing the button, the burners
go out, wait one minute and then repeat the
ignition procedure.

5.2 Initial operation and further start-ups of
Device Type : NG-35-100

After opening the gas valve and setting the
desired heat output on the switching box of the
WAH, set the operating switch to 

I

 (Item 2)

.

 The

fan will start.

In the case of operation using a room thermostat,
the thermostat must be set using room
temperature.

With fan, ignition is automatically turned on and
after a short pre-purge time, the solenoid (Item 9)
is opened.

After establishing the flame, ignition is
automatically shut off. The device has reached its
operating setting.

If the flame has not yet formed after lapse of the
ignition time, the aforesaid ignition procedure is
repeated up to four times. If the flame has still not
formed, the solenoid (Item 9) automatically closes
the gas supply.

Likewise, if the flame goes out during operation,
the solenoid will immediately close the gas supply.

The automatic gas-firing unit has executed a fault
shut-down and executed an interlock. The read
fault light on the switching box lights up.

Once any fault has been eliminated, after
approximately 60 sec the device can be restarted
by pressing the reset button (Item 24).

6. PLACING OUT OF SERVICE

Place the selection switch in the 

0

 position

and close the gas infeed.

The WAH must be completely cooled prior to
transport.

7. MAINTENANCE

For assuring operational reliability and to achieve
optimal efficiency, the WAH must be serviced and
cleaned at appropriate intervals.

To do this the following must be unconditionally
observed :

  When carrying out maintenance, disconnect

the mains plug and close the gas line.

  The WAH, especially the fan must be checked

at regular intervals for dirt and, if necessary,
cleaned.

 

Do not

 use water for cleaning!

  Use only the original equipment

manufacturer's replacement parts.

  Repairs to electrical and gas conducting

components must be done only by specialist
personnel!

  On completion of service work, initial start-up

together with function check must be re-done.

Содержание NG-100

Страница 1: ...0 Betriebsanleitung Operating Instructions Mode d utilisation NG 15 35 50 75 100 Gustav Nolting GmbH Neuzeitliche Heiztechnik...

Страница 2: ...stellung Montage Seite 3 4 5 Inbetriebnahme Seite 4 6 Ausserbetriebnahme Seite 4 7 Wartungsarbeiten Seite 4 8 M gliche St rungen und deren Ursachen Seite 5 9 Ersatzteillisten und Bauteile bersicht Sei...

Страница 3: ...druck bar 2 5 10 0 2 5 10 0 2 5 10 0 2 5 10 0 2 5 10 0 Anschlu wert kg h 0 54 1 09 1 41 2 73 1 95 3 91 2 73 5 47 3 91 7 81 Stromaufnahme A 0 48 0 48 0 48 0 60 0 92 L nge mm 500 500 650 800 1 000 Breit...

Страница 4: ...onisationselektrode dient als Flammen berwachung und ist an einen Gas feuerungsautomaten angeschlossen der die Gesamtfunktion des WLE steuert und berwacht 4 AUFSTELLUNG MONTAGE Um Personen und Sachsch...

Страница 5: ...ebungstemperatur einge stellt werden Mit dem Ventilator wird die Z ndung automatisch eingeschaltet und nach einer kurzen Vorsp lzeit das Magnetventil Pos 9 ge ffnet Nach der Flammenbildung wird die Z...

Страница 6: ...lt zu gro Z ndkabel defekt Pos 7 Gasfeuerungsautomat defekt Pos 16 Austauschen Verkleinern Austauschen Austauschen WLE l uft an Z ndung ist vor handen Magnetventil ffnet Gas str mt ein wird entz ndet...

Страница 7: ...11 Thermostromunterbrecher 102814 12 Z ndelektrode 103314 103312 103312 103311 103311 13 Piezoz nder 103315 14 Ger teregler 103040 103040 103040 103040 103040 15 Sicherheitstemperaturbegrenzer STB 100...

Страница 8: ...7 NG 15 35 50...

Страница 9: ...8 NG 75 100...

Страница 10: ...9 11 ELEKTRISCHER SCHALTPLAN Ger tetyp NG 15...

Страница 11: ...10 11 ELEKTRISCHER SCHALTPLAN Ger tetyp NG 35 50...

Страница 12: ...11 11 ELEKTRISCHER SCHALTPLAN Ger tetyp NG 75 100...

Страница 13: ...sembly Page 14 15 5 Initial operation and further start ups Page 15 6 Placing out of service Page 15 7 Maintenance Page 15 8 Possible malfunctions and their causes Page 16 9 Spare Parts List and Compo...

Страница 14: ...on pressure bar 2 5 10 0 2 5 10 0 2 5 10 0 2 5 10 0 2 5 10 0 Connected load kg h 0 54 1 09 1 41 2 73 1 95 3 91 2 73 5 47 3 91 7 81 Power consumption A 0 48 0 48 0 48 0 60 0 92 Length mm 500 500 650 80...

Страница 15: ...he automatic gas firing unit that controls and monitors the overall function of the WAH 4 INSTALLATION ASSEMBLY In order to prevent personal injury and property damage the relevant local building fire...

Страница 16: ...om thermostat the thermostat must be set using room temperature With fan ignition is automatically turned on and after a short pre purge time the solenoid Item 9 is opened After establishing the flame...

Страница 17: ...nition gap too large Ignition cable defective Item 7 Automatic gas firing unit defective Item 16 Replace Reduce Replace Replace WAH starts ignition present solenoid valve opens gas flows in is ignited...

Страница 18: ...l 102661 102389 102389 11 Thermo circuit breaker 102814 12 Ignition electrode 103314 103312 103312 103311 103311 13 Piezo igniter 103315 14 Device controller 103040 103040 103040 103040 103040 15 Safe...

Страница 19: ...18 NG 15 35 50...

Страница 20: ...19 NG 75 100...

Страница 21: ...20 11 ELECTRICAL CIRCUIT DIAGRAM Device Type NG 15...

Страница 22: ...21 11 ELECTRICAL CIRCUIT DIAGRAM Device Type NG 35 50...

Страница 23: ...22 11 ELECTRICAL CIRCUIT DIAGRAM Device Type NG 75 100...

Страница 24: ...llation Assemblage Pages 25 26 5 Mise sous tension Page 26 6 Mise hors tension Page 26 7 Maintenance Page 26 8 Les dysfonctionnements possibles et leurs causes Page 27 9 Liste des pi ces de rechange e...

Страница 25: ...n du gaz l entr e bar 2 5 10 0 2 5 10 0 2 5 10 0 2 5 10 0 2 5 10 0 D bit de gaz kg h 0 54 1 09 1 41 2 73 1 95 3 91 2 73 5 47 3 91 7 81 Consommation de courant A 0 48 0 48 0 48 0 60 0 92 Longueur mm 50...

Страница 26: ...er des dommages personnels et mat riels les r gulations en vigueur relatives la construction la protection contre les incendies ainsi que les stipulations des associations professionnelles sont respec...

Страница 27: ...p rature ambiante L allumage est enclench en m me temps que le ventilateur et apr s un bref d lai de pr rin age la vanne lectromagn tique s ouvre pos 9 Lorsque la flamme est allum e l allumage s teint...

Страница 28: ...trop grande C ble d allumage d fectueux pos 7 Br leur gaz automatique d fectueux pos 16 Remplacez R duisez Remplacez Remplacez Le GAC d marre l allumage s enclenche la vanne lectromagn tique s ouvre l...

Страница 29: ...Disjoncteur de courant thermo lectrique 102814 12 Electrode d allumage 103314 103312 103312 103311 103311 13 Pi zoallumage 103315 14 R glage de l appareil 103040 103040 103040 103040 103040 15 Limitat...

Страница 30: ...29 NG 15 35 50...

Страница 31: ...30 NG 75 100...

Страница 32: ...31 11 SCHEMA DES CONNEXIONS ELECTRIQUES Type d appareil NG 15...

Страница 33: ...32 11 SCHEMA DES CONNEXIONS ELECTRIQUES Type d appareil NG 35 50...

Страница 34: ...33 11 SCHEMA DES CONNEXIONS ELECTRIQUES Type d appareil NG 75 100...

Страница 35: ...derger tebau Blechbearbeitung Our Comprehensive Supply Program Warm Air Heaters System Construction Air Ducts Fans for air supported domes and other flexible structures Control Systems Construction Li...

Отзывы: