S:FLEX LEICHTmount 2.1 E/W Скачать руководство пользователя страница 22

22

Terms of use

3.1    

Usage agreement for the 

LEICHTmount 2.1 E/W

We wish to point out that the installation system is sold under a purchase agreement.

Its installation, processing or purchase by third parties does not take place on behalf of S:FLEX GmbH.

Installation/processing of the system must be carried out in strict accordance with the installation instructions.

The design and planning of the system must be carried out using the S:FLEX planning software (Solar.Pro.Tool). S:FLEX 

GmbH is not responsible for the project-related structural analysis of the roof structure, for obtaining and documenting 

the roof manufacturer's approval for the attachment of the corresponding fasteners on the respective roof (in terms of 

warranty ramifications), or for correct installation of the system.

Faults and damage or impaired/inadequate functioning of the system that are the result of faulty installation and/or 

failure to observe the installation instructions and/or the project report (Solar.Pro.Tool) shall not constitute a defect for 

which S:FLEX GmbH is responsible. In the case of faulty workmanship by the purchaser or third parties, the rights of 

the purchaser to assert claims due to a defect in the goods shall expire.

The system warranty is only valid if all system components are purchased from S:FLEX GmbH.

The system requires that the modules may also be mounted in the indicated manner (i.e. clamped on the modules' 

shorter side). This approval can either be given generally as part of the module certification or, as the case may be, 

issued by the module manufacturer on a project-specific basis.

© S:FLEX GmbH 02/2017/ Subject to technical modifications

S:FLEX GmbH           

             

Reinbeker     Weg    9           21029    Hamburg          Tel. +49-(0)40-68893170

     

          

 

   

  

       

 

Sasbacher    Straße   7           79111    Freiburg             Tel. +49-(0)761-888 56 08-0

[email protected]     www.sflex.com 

     

Содержание LEICHTmount 2.1 E/W

Страница 1: ...Photovoltaic Mounting Systems Assembly Instructions LEICHTmount 2 1 E W Aerodynamic flat roof system for east west orientation S FLEX GmbH 02 2017 Subject to technical modifications 1...

Страница 2: ...gs 4 1 4 General information 4 1 5 Installation 5 1 6 Standards and guidelines 6 1 7 Description of the system 7 Installation LEICHTmount 2 1 E W 2 2 1 System components 13 2 2 Installation Racking an...

Страница 3: ...concrete Any use that deviates from this is classified as not intended In particular compliance with the specifications of this installation guide is part of the intended use An important part of this...

Страница 4: ...tatiker direkt vor Ort Jede Photovoltaikanlage ist entsprechend den statischen Erfordernissen des Standorts und der Einbausituation unter Beachtung der Vorgaben der vorliegenden Montageempfehlung zu m...

Страница 5: ...en Dachdeckerhandwerks ZVDH arbeiten Systemkomponenten Dachhaken Systemtr ger sind nicht als Trittleiter zu verwenden die Module sind nicht zu betreten Bei der Errichtung von PV Anlagen auf Flachd che...

Страница 6: ...to seek expert advice before starting the installation In addition the manufacturer of the photovoltaic system must be consulted before the installation in order to ensure that the existing roofing a...

Страница 7: ...ravel green concrete The compatibility of the roof covering and the protective mats must be ensured The roof covering and possibly the insulation layer must be able to absorb the pressure loads of the...

Страница 8: ...recipient or a third party in other ways Contraventions oblige to compensation and can be prosecuted A B C D E F 1 2 3 4 5 6 7 8 ARRAY MEASUREMENTS allowable tolerances Surface Name Name Date Scale We...

Страница 9: ...8 0 info sflex com www sflex com Basic conditions for the module field size The minimum size of the module field for the LEICHTmount 2 1 E W is 2 rows with 2 double modules 8 modules The maximum size...

Страница 10: ...y rivet Nut M8 Ballast Block 16 x 8 x 2 inch ADDITIONAL END CLAMP FOr HIGHEr WINDzONE END CLAMP PrOTECTION PAD with Aluminium Coating PrOTECTION PAD with Aluminium Coating M8 Screw rivet Nut M8 Ground...

Страница 11: ...tung der Stehfalzklemmen mittels Richtschnur In endg ltiger Position gleichm ig festschrauben Anzugsmoment 15 Nm 5 Planungsgrundlage pr fen Anbindung bis 10 Dachneigung m glich Abstand Stehfalzklemme...

Страница 12: ...reas in which the installation system must be fire tested in accordance with UL1703 The cover plate is secured between the end clamp and the bracket falzklemme men Ausrichtung der Stehfalzklemmen mitt...

Страница 13: ...7 79111 Freiburg Tel 49 0 761 8885608 0 info sflex com www sflex com Top part Bottom part Flathead screw Alpine front support Front part Ballast tray 880 Module End clamp 33 50mm Module mid clamp Modu...

Страница 14: ...ts und Gesundheits schutz vorab sicherzustellen Generell gilt die Montage sollte nur von Fachkr ften ausgef hrt werden die nach den Regeln des Deutschen Dachdeckerhandwerks ZVDH arbeiten Systemkompone...

Страница 15: ...Modulmontage angepasst Modulbreite Gestell und Module 14 15 2 Installation LEICHTmount 2 1 E W S FLEX GmbH 02 2017 Subject to technical modifications S FLEXGmbH Reinbeker Weg 9 21029 Hamburg Tel 49 0...

Страница 16: ...n S FLEX GmbH Reinbeker Weg 9 21029 Hamburg Tel 49 0 40 18 15 46 13 Sasbacher Stra e 7 79111 Freiburg info s ex com www s ex com S FLEX GmbH 02 2016 Techn 1 5 Installation Diese Montageempfehlung dien...

Страница 17: ...n Fachkr ften ausgef hrt we Deutschen Dachdeckerhandwerks ZVDH arbeiten Systemkompon sind nicht als Trittleiter zu verwenden die Module sind nicht zu betr Bei der Errichtung von PV Anlagen auf Flachd...

Страница 18: ...l 49 0 40 68893170 Sasbacher Stra e 7 79111 Freiburg Tel 49 0 761 8885608 0 info sflex com www sflex com Optional alpine supports Position the Top part in the centre of the module and secure it with t...

Страница 19: ...iert Aus Verschattungsgr nden k nnen in der vorderen Ballastwanne max 5 Steine verbaut werden Bringen Sie unter der Ballastwanne links und rechts die selbstklebende Bautenschutzmatte an die im Lieferu...

Страница 20: ...end clamps In order to achieve an optimally integrated system and keep the ballast requirements as low as possible it is necessary to mount two end clamps on the long side of the module in addition t...

Страница 21: ...artung zu kontrollieren Es liegt in der Verantwortung der installierenden Firma die geforderte Ballastblock Spezi kation und das Gewicht zu kontrollieren 2 6 Installation Ballastierung Ballastierung 2...

Страница 22: ...amage or impaired inadequate functioning of the system that are the result of faulty installation and or failure to observe the installation instructions and or the project report Solar Pro Tool shall...

Страница 23: ...earing structure snow load zone building heights wind loads etc using the project data sheet and submit this to the company S FLEX GmbH The company S FLEX GmbH shall not be liable for incorrect handli...

Отзывы: