English
11
EN
FR
DE
ES
IT
NL
PT
DA
SV
FI
NO
RU
PL
CS
HU
RO
LV
LT
ET
HR
SL
SK
BG
UK
TR
MAINTENANCE SCHEDULE
Before
each use
After 1st month
or 20 hours of
operation
Every 3 months
or 50 hours of
operation
Every 6 months
or 100 hours
of operation
Every 12 months
or after 300 hours
of operation
Check engine oil
Change engine oil
Check air
fi
lter
Clean air
fi
lter
Change air
fi
lter
Replace the fuel
fi
lter
Check/adjust spark plug
Replace spark plug
Check/adjust idle speed
Check/adjust valve
clearance*
Clean fuel tank and
fi
lter*
Check fuel tube
Check for worn or
damaged parts
Check all starting
interlock and power lever
for proper functionality
Check if the blade stops
within 3 seconds after
releasing the power lever
* These items should only be carried out by an authorised service centre.
NOTE:
Maintenance should be performed more frequently when the product is used in dusty areas.
When the engine has exceeded the maximum figures specified in the table, maintenance should still be cycled
according to the intervals of time or hours stated herein.
Содержание RLM46140
Страница 321: ...Türkçe 319 EN FR DE ES IT NL PT DA SV FI NO RU PL CS HU RO LV LT ET HR SL SK BG UK TR ...
Страница 346: ......
Страница 347: ......
Страница 348: ...Techtronic Industries GmbH Max Eyth Straße 10 71364 Winnenden Germany 099923012090 03 ...