background image

16

Содержание RBJ254N

Страница 1: ...ORIGINAL INSTRUCTIONS Jet Blower RBJ254N...

Страница 2: ...Important It is essential that you read the instructions in this manual before assembling operating and maintaining the product Subject to technical modification...

Страница 3: ...if precautions to limit your exposure reduce noise and wear hearing protection are not strictly adhered to Wear full eye protection at all times while operating the product The manufacturer strongly s...

Страница 4: ...store fuel in a container approved for fuel Keep an appropriate type of fire extinguisher nearby for dealing with fuel fires Remember to securely refit the fuel tank cap before starting the engine Wip...

Страница 5: ...naccessible to children Keep away from corrosive agents such as garden chemicals and de icing salts Do not store outdoors MAINTENANCE WARNING When servicing use only identical parts Use of any other p...

Страница 6: ...check valve may be faulty Replace fuel cap if required When refitting the fuel cap ensure it is not cross threaded otherwise it will leak FUEL FILTER The fuel supplied to the engine is passed through...

Страница 7: ...ll as knowledge of the project you are attempting to do Before use of the product familiarise yourself with all operating features and safety rules BLOWER TUBE The blower tubes can be assembled and in...

Страница 8: ...ds along with hearing protection Failure to do so could result in serious injuries such as objects being thrown into your eyes FUELLING AND REFUELLING MIXING THE FUEL The product is powered by a 2 str...

Страница 9: ...bulb 10 times NOTE After the 7th press fuel should be visible in the primer bulb If it is not continue to press the primer until you see fuel in the bulb 2 Set the choke lever to the FULL CHOKE posit...

Страница 10: ...und levels limit the number of pieces of equipment used at any one time 3 Operate blower at the lowest possible throttle speed to do the job NOTE In dusty conditions slightly dampen surfaces when wate...

Страница 11: ...Compliance Mark RCM The product meets applicable regulatory requirements Waste electrical products should not be disposed of with household waste Please recycle where facilities exist Check with your...

Страница 12: ...12 UNPACKING x 1 x 1 x 1 x 1 x 1 RBJ254N...

Страница 13: ...T 1 2 4 5 3 9 10 11 12 13 6 7 8 1 On Off switch 2 Cruise lever 3 Throttle trigger 4 Handle 5 Spark plug cap 6 Choke lever 7 Primer bulb 8 Shoulder strap 9 Starter grip and rope 10 Fuel tank 11 Fuel ca...

Страница 14: ...14 GETTING STARTED 50 1 1 7 2 8...

Страница 15: ...15 GETTING STARTED GETTING STARTED GETTING STARTED 4 1 2 9 10 1 2 3 4 6 11 12 13 2 1 3 1 2 10 10 5 6...

Страница 16: ...16...

Страница 17: ...17 OVERVIEW p 18 p 20 p 23 p 25 p 21 p 26...

Страница 18: ...18 OPERATION 10 10 6 1 3 2 4...

Страница 19: ...19 OPERATION 5 6...

Страница 20: ...20 OPERATION 1 2 2 1...

Страница 21: ...21 OPERATION 1 2 1 3 2 4...

Страница 22: ...22 OPERATION 5...

Страница 23: ...23 OPERATION 1 2 2 4 1 3...

Страница 24: ...24 OPERATION 1 2 5 6...

Страница 25: ...25 MAINTENANCE 1 2...

Страница 26: ...26 STORAGE 3 1 2 4 2 1 2 4 1 3 20170905v1...

Страница 27: ...Engine speed max 8800 min Engine speed idle 3400 3800 min Air velocity 257 km h Air volume 882 m3 hr Weight without fuel 5 42 kg Vibration Idling 9 5 m s2 Racing 18 9 m s2 Equivalent vibration total v...

Страница 28: ...orted by Techtronic Industries Australia Pty Ltd 31 Gilby Road Mount Waverley VIC 3149 Melbourne Australia Techtronic Industries N Z Limited 2 Landing Drive Mangere Auckland 2022 New Zealand 961175031...

Отзывы: