
3
MOBILE AND WORKSHOP SERIES OPERATION MANUAL
October 2018 | Version: v1-0
CHECKLIST
GENERAL
Pre-Delivery Checklist
Pre-Commencement Inspection
RY20C/RY32C
RY20CB/RY32CB
Crimper wrapped in plastic and packed in a
suitable box for Air & Sea freight
Crimper wrapped in plastic and packed in a
suitable box for Air & Sea freight
Grease Cartridge
RY20CB or RY32CB Crimper complete with
base/die storage
Grease Application Tool
Foot Pedal
Technical User Manual
Grease Cartridge
Manual Change Tool
Grease Application Tool
Die Pins
Technical User Manual
Back Stop
Quick Change Tool
Manual Change Tool
Die Pins
Die Sets
RY20
Included Dies
RY32
Included Dies
Optional Dies
If Ordered
14mm
63mm
7mm
16mm
69mm
10mm
19mm
74mm
12mm
22mm
78mm
26mm
30mm
34mm
39mm
45mm
Before using the crimper for production, this checklist should be performed using procedures outlined herein.
Check RYCO logo, safety labels and Crimp Chart decals are attached.
Grease cone-shaped surfaces in the cylinder.
Check for no abnormal noise during operation across full range of motion.
Check all dies are supplied and appropriately numbered.
Check calibration as per calibration procedure.
RYCO recommend a risk assessment be performed by the end-user prior to installation and use.