12/05
ID# M881111
29
Fill pole with concrete approximately 1” (2.54
cm) below bottom elevator hole as shown.
IMPORTANT!:
WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.
CONCRETE MUST CURE.
1
9.
IMPORTANT!:
FAILURE TO FILL YOUR
POLE COMPLETELY
WITH CONCRETE AS
DESCRIBED IN THESE
INSTRUCTIONS WILL
VOID ALL WARRANTIES
WRITTEN AND IMPLIED.
IMPORTANT!:
Make sure that
concrete does not bulge
from the end of pole
assembly. Allow
concrete to completely
cure.
10.
Install net (34).
B.
D.
C.
A.
34
34
All manuals and user guides at all-guides.com