background image

Preface 

 

Thank you for using our switches. This guide (Version: V1.0) provides you with detailed operation guide that 
allows you to easily install and use the switches. 

Scope 

This manual describes the functions and physical features of the switches, and presents the installation procedure, 
troubleshooting procedure, technical specifications, and specifications and usages rules of cables and connectors. 
It is intended for the users that have some experience in installing and maintaining network hardware and want to 
learn the above information. At the same time, it is assumed that the users of this switch are already familiar with 
the related terms and concepts of Ethernet.

 

Document Structure 

 Chapter 

"

Product Overview

" describes the main characteristics, technical specifications, and related 

modules of this product. 

 

Chapter 2 "

Preparation before Installation

" lists the safety, power supply, and site requirements that must 

be met before the switch can be installed. 

 

Chapter 3 “

Product Installation

” describes how to install the integrated switch and modules, and connect its 

power cables and grounding lines. 

 

Chapter 4 "

System Debugging

" describes the debugging after the switch is powered on for the first time. 

 Chapter 

"Troubleshooting"

 describes possible problems, detections and solutions in the switch installation 

and application. 

 Appendix 

Connector and Connection Media

” 

 

Appendix B “

Mini-GBIC Modules

” 

Related Documents 

Software manual of switches——covering CLI commands, software configuration guide, and version release notes. 

Obtaining Documentation

 

You can obtain the documentation you need through the following channels: 

Internet: 

You can obtain the latest on-line documentation of Ruijie Networks at: 

http://www.ruijie.com.cn 

Documentation CD-ROM: 

The documentation of Ruijie Networks switches is stored in the CD-ROM package, which is provided to you together 
with the product you purchase. The CD-ROM is updated frequently, and may be more current than the printed 
documents. 

Obtaining Technical Assistance 

Ruijie Networks provides excellent technical support services for all our products. You can obtain the technical 
assistance you need through any of the following channels: 

 

Ruijie Networks website, from which you can obtain the latest product documentation, causes and problems 
analysis of product faults, application solutions, and software upgrade. 

 

Customer service center of Ruijie Networks, which can provide all customers with needed technical 
assistance for products, technologies and solutions. The customer service center provides responsive 
technical support for your product installation problems, software configuration problems, and other network 
performance problems. 

 

Customer services hotline: 4008-111-000 

 Customer 

services 

website: 

http://www.ruijie.com.cn

 

Содержание RG-S2924GT/8SFP-XS-P

Страница 1: ...Installation Manual RG S2924GT 8SFP XS P...

Страница 2: ...ans are all registered trademarks of Ruijie Networks Ltd and are protected by law Disclaimer The information contained in this manual may be modified without notification Ruijie Networks has tried its...

Страница 3: ...16 2 3 1 Safety Grounding 16 2 3 2 Lightning Grounding 16 2 3 3 EMC Grounding 16 2 4 Lightning Resistance Considerations 16 2 5 EMI Consideration 17 2 6 Precaution for Fiber Connections 17 2 7 Precaut...

Страница 4: ...2 1 Checking before Power on 23 4 2 2 Checking after Power on Recommended 24 Chapter 5 Maintenance and Troubleshooting 25 5 1 General Troubleshooting Procedure 25 5 2 Troubleshooting Common Faults 25...

Страница 5: ...ns in the switch installation and application Appendix A Connector and Connection Media Appendix B Mini GBIC Modules Related Documents Software manual of switches covering CLI commands software config...

Страница 6: ...Conventions The symbols used in this document are described as below This symbol draws the attention of readers to some suggestions and references This symbol reminds readers to be alert of wrong ope...

Страница 7: ...wer The extension module slot supports M5000E 02SFP GT M5000E 01XS and M5000E 02XS modules Table1 2 lists the supported extension modules Table 1 2 Supported Extension Modules Model 1000Base X SFP por...

Страница 8: ...type Dual power Power supply AC input Rated voltage range 100 240V Maximum voltage range 90 264V Frequency 50 60Hz Rated current 6A POE Supported on all RJ45 ports up to 30W power supported on each po...

Страница 9: ...XS P Ethernet switch provides twenty four 10 100 1000Base T Ethernet ports eight GE SFP fiber copper combo ports and one Console port The backplanel provides two power module slots and two extension m...

Страница 10: ...module chapter Dual power input The switch power can be supplied by 1 power module or by 2 power modules When both two modules are available the switch power is supplied by the redundant power input W...

Страница 11: ...reen The switch is being initialized If the blinking persists however it indicates that an abnormality occurs Solid green Normal switching is performed by the switch Solid yellow It indicates a warnin...

Страница 12: ...o is Up Blinking green Data at a rate of 1000 M are being transceived at the port Solid yellow The 100 M link that the port connects to is Up Blinking yellow Data at a rate of 100 M are being transcei...

Страница 13: ...off all power supplies and dismantle all power modules 2 1 3 Electric Safety Observe local regulations and specifications when performing electric operations Relevant operators must be qualified Care...

Страница 14: ...penings to ensure the normal ventilation After various cables have been connected they should be arranged into bundles or placed on the cabling rack to avoid blocking the air inlets 2 2 2 Temperature...

Страница 15: ...e intrusion of harmful gases such as sulfur dioxide sulfured hydrogen nitrogen dioxide and chlorine whose requirements are listed in Table 2 3 Table 2 3 Requirements for harmful gases in the equipment...

Страница 16: ...shares the power reference ground and yellow green safety cable ground The lightning discharge ground is for the facility only irrelevant to the equipment 2 3 3 EMC Grounding The grounding required fo...

Страница 17: ...rference may affect any signal path in the equipment and is difficult to shield 1 Effective measures should be taken for the power system to prevent the interference from the electric grid 2 The worki...

Страница 18: ...The power module is hot swappable It s recommended to disable all power switches when plugging in out the power module and enable the switch with the power module inserted and installed...

Страница 19: ...tools Common tools Cross screwdriver straight screwdriver related electric cables and optical cables bolts diagonal pliers straps Special tools Anti static tools Meters Multimeter The RG S2924GT 8SFP...

Страница 20: ...Confirmations before Installation Before installation please confirm the following points Whether sufficient airflow is available for the switch Whether the requirements of the switch for temperature...

Страница 21: ...elding should be adopted For example use interface cables to shield cables Interface cables should be laid inside the equipment room Outdoor cabling is prohibited avoiding damages to device signal int...

Страница 22: ...around the switch can flow freely 3 4 Checking after Installation Before checking the installation switch off the power supply so as to avoid any personal injury or damage to the component due to con...

Страница 23: ...PC Step 2 Connect one end of the console cable RJ45 to the console port of the switch 4 1 3 Setting Terminal Parameters Step 1 Start the PC and run the terminal simulation program on the PC such as Te...

Страница 24: ...the parameters are already configured 4 2 2 Checking after Power on Recommended After power on you are recommended to perform the following checks to ensure the normal operation of follow up configura...

Страница 25: ...tatus indicator is not on after the switch is started The power supply module does not supply power The power cable is in loose contact Check whether the power socket at the equipment room is normal a...

Страница 26: ...cted switch The fiber port cannot be connected The Rx and Tx ends are connected reversely The interconnected optical module type does not match The fiber type is not correct The length of the optical...

Страница 27: ...hematic diagram for the four twisted pairs of the 1000BASE T Straight Through Crossover Switch Switch 1TP0 1TP0 2TP0 2TP0 3TP1 3TP1 6TP1 6TP1 4TP2 4TP2 5TP2 5TP2 7TP3 7TP3 8TP3 8TP3 Switch Switch 1TP0...

Страница 28: ...orts select single mode or multiple mode optical fibers for connection according to the fiber module connected The connection schematic diagram is shown in Figure A 4 Figure A 4 Schematic diagram for...

Страница 29: ...M1310 1310 Multi mode optical fiber 62 5 125 N A 2km 14 14 IEEE802 3 FE SFP LH15 SM1310 1310 Single mod e optical fiber 9 125 N A 15km 8 8 Mini GBIC SX 850 Multi mode optical fiber 62 5 62 5 50 0 50...

Отзывы: