
Ruijie RG-NBS5200 Series Switches Hardware Installation and Reference Guide
System Commissioning
28
The console cable is correctly connected; the PC is already started; the parameters are already configured.
Checking after Power-on (Recommended)
After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up
configurations.
Check whether the status of the switch indicator is normal.
Check whether the main program is loaded normally.
Check whether the service interface forwards data normally.