
·
Chapter 4 System Debugging
Setting up a Debugging Environment
Use a power adapter or PoE to power the AP.
Setting up the Environment
Verify that the AP is properly connected to the power source.
Connect the AP to an AC through a twisted pair cable.
When the AP is connected to a PC for debugging, verify that the PC and PoE switch are properly grounded.
Powering up the AP
Checking before power-up
Verify that the power supply is properly connected.
Verify that the input voltage matches the specification of the AP.
Checking after power-up (recommended)
After powering up, it is recommended that you check the following to ensure normal operation of the AP.
Check if any message is printed on the Web-based configuration interface of the AC.
Check if the LED works normally.
Содержание RG-AP520-I(G2) Series
Страница 1: ...RG AP520 I G2 Series Access Point Hardware Installation and Reference Guide V1 0 ...
Страница 10: ... ...
Страница 28: ... ...