Rugged Interactive
Unit 1, Callywith Court
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
TriggerTrac
–
Section 3 - Installation
© Rugged Interactive
20
21
3.4
–
Detailed Installation
Read this manual before installing TriggerTrac.
Installation Guidelines:
▪
Complete the Site Survey form prior to delivery and/or installation.
▪
Send a completed Installation Checklist after any installation to Rugged Interactive.
▪
A typical installation should take 2 people about 3 hours.
▪
No obstructions or protrusions in the installation area: e.g. skirting boards, pipes, cables and wiring
conduits.
▪
Avoid trapped and/or pinched cables.
▪
Use good practice when running data cables to and from products, external pods and sensors.
Support long cables at least every 50 cm and provide adequate strain relief for connection points.
▪
To prevent electric shock, keep all electric components away from contact with water.
▪
IMPORTANT: Take anti-static precautions.
Structure:
▪
TriggerTrac is supplied as 1 x start button and up to 1 x stop pressure panel (stop button) plus 1 x
Hub display box and appropriate cables.
▪
The start button can be fitted in any orientation - onto an appropriately sized plinth or post, or onto a
vinyl padded wall - so long as their CAT5 cable is fed back to the distribution box.
▪
The pressure panel should be mounted to a plywood wall (min 12mm) which has a 70mm recess
behind. One 502 x 242mm hole (+3 / - 0) must be cut at a suitable height for the pressure panel to
be mounted to the wall.
▪
The score box should be mounted to a plywood wall (min 12mm) which has a 70mm recess behind.
A 502mm x 482mm hole (+3 / - 0) will need to be cut from the plywood for the score box.
▪
The units must be mounted to a flat/level construction capable of supporting their weight and
gameplay. (Uneven walls and surfaces make alignment and fitting very difficult.)
▪
Mount onto 18 mm plywood (12 mm minimum) mechanically mounted to a steel framework (50 mm
box minimum). The plywood should be covered with foam-backed vinyl.
▪
Units can either be secured on top of the foam-backed vinyl or embedded in a purpose-made cut-
out. Adequate holes will need to be cut during installation to provide clearance for cable access to
rear if required.
Fixings:
▪
The manufacturer will supply fixings.
▪
All fixings must be tight and secure.
Содержание TriggerTrac
Страница 25: ...Features Power Supply Specification for 5 9V...