TrailBlazer
®
Traverse HEX
Order and Installation Manual:
Installation
TrailBlazer
®
Traverse HEX
–
Section 3 - Installation
© Rugged Interactive
2019
10.
Use a stepladder to view the top of one corner piece. Position a top jointing plate on top of the
corner piece and secure. (See
Figure 2.5
.) Repeat for each corner.
Figure 2.5:
Top joining plates
11.
Mount the control box in a suitable position, such as central pillar or nearby structure. We do not
recommend that the control box be positioned on top of one of the mouldings.
12.
Connect the loose ends of the CAT5 cables into their corresponding positions (as labelled). Connect
the control box to a power source and turn on.
13.
Check that the QuickStart games flash red and that they start the correct program. This will ensure
that the pods are connected correctly.
14.
Once all pods are connected correctly, fully secure all interactive pods with the remaining fixings.
(NB: Do not overtighten grip screws.)
15.
Use box trunking to tidy away and secure the cables along the top of the wall mouldings.
Top joining
plate